GeniePoint · EV charging site
Welton Rd
Welton Rd, Brough, HU15 1AF
Welton Rd is an EV charging site in Brough, East Riding of Yorkshire, run by GeniePoint. Its 3 sockets reach up to 50 kW, with CHAdeMO and CCS at the top speed. 1 other charging site is listed within a mile, and the nearest other site with 50 kW or more is Ferry Inn, Brough (Osprey Charging), 0.5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- GeniePoint
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- Geniepoint 50kw Rapid ( £1 fee + 30p per kw ) AC is a 22kw Socket ( 50p fee + 30 per per Kw(from Open Charge Map, 2 Oct 2020)
- Phone (from Open Charge Map)
- +44 800 999 4240
- Notes
- £10 overstay fee after 95 mins, then £10 every subsequent 95 mins
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Welton Rd (GeniePoint)?
The listed price is Geniepoint 50kw Rapid ( £1 fee + 30p per kw ) AC is a 22kw Socket ( 50p fee + 30 per per Kw. Prices can change, so check the price at the charger before you start.
How fast is charging at Welton Rd (GeniePoint)?
Up to 50 kW DC via Type 2, CHAdeMO, CCS.
How many charging sockets does Welton Rd (GeniePoint) have?
3 charging sockets: 1 × 22 kW Type 2, 1 × 50 kW CHAdeMO, 1 × 50 kW CCS.
Who operates Welton Rd?
Welton Rd is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.
Where is the nearest other charger with 50 kW or more to Welton Rd (GeniePoint)?
Ferry Inn, Brough (Osprey Charging) is 0.5 miles away in a straight line, with up to 75 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Welton Rd (GeniePoint)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Welton Rd (GeniePoint)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Welton Rd (GeniePoint)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Cheapest nearby
- Ferry Inn, Brough · 89p per kWh · 75 kW · 0.5 mi
- Fastest nearby
- Ferry Inn, Brough · 75 kW · 0.5 mi