GeniePoint · EV charging site
West End Car Park
West End Car Park, Bristol, BS8 1EH
West End Car Park is an EV charging site in Bristol, City of Bristol (BS8 1EH), run by GeniePoint. Both of its sockets are 7 kW Type 2. Amp Map lists 1 other charge point named West End Car Park in Bristol. 19 other charging sites are listed within a mile, and the nearest site with 50 kW or more is College Street Car Park (GeniePoint), 0.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- GeniePoint
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Phone (from Open Charge Map)
- +44 800 999 4240
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at West End Car Park (GeniePoint)?
Up to 7 kW AC via Type 2.
How many charging sockets does West End Car Park (GeniePoint) have?
2 charging sockets: 1 × 7 kW Type 2, 1 × 7 kW Type 2.
Who operates West End Car Park?
West End Car Park is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.
Where is the nearest charger with 50 kW or more to West End Car Park (GeniePoint)?
College Street Car Park (GeniePoint) is 0.4 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at West End Car Park (GeniePoint)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at West End Car Park (GeniePoint)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at West End Car Park (GeniePoint)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.