GeniePoint · EV charging site
Windsor Street Car Park
1 Windsor Gardens, Bromsgrove, B60 2QA
Windsor Street Car Park is an EV charging site in Bromsgrove, Worcestershire, run by GeniePoint. It has a single socket, with CHAdeMO and CCS at up to 50 kW, and the price is listed as £0.35/kWh. 7 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Asda Bromsgrove (GeniePoint), 0.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- GeniePoint
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.35/kWh(from Open Charge Map, 19 Jan 2022)
- Phone (from Open Charge Map)
- +44 800 999 4240
- Getting there
- £10.00 overstay fee after 90 mins, then £10.00 every subsequent 90 mins
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Windsor Street Car Park (GeniePoint)?
The listed price is £0.35/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Windsor Street Car Park (GeniePoint)?
Up to 50 kW DC via Type 2, CHAdeMO, CCS.
How many charging sockets does Windsor Street Car Park (GeniePoint) have?
1 charging socket: 1 × 43 kW Type 2, 1 × 50 kW CHAdeMO, 1 × 50 kW CCS.
Who operates Windsor Street Car Park?
Windsor Street Car Park is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.
Where is the nearest other charger with 50 kW or more to Windsor Street Car Park (GeniePoint)?
Asda Bromsgrove (GeniePoint) is 0.1 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Windsor Street Car Park (GeniePoint)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Windsor Street Car Park (GeniePoint)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Windsor Street Car Park (GeniePoint)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.