GeniePoint · EV charging site
Yeadon One Stop Centre
High Street, Yeadon, LS19 7PP
Yeadon One Stop Centre is an EV charging site in Yeadon, City and Borough of Leeds, run by GeniePoint. It has a single socket, with CHAdeMO and CCS at up to 50 kW, and charging is listed as free. 4 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Woolpack Inn, Leeds (Osprey Charging), 0.5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- GeniePoint
- Opening hours
- Not published
- Access
- Public
- Price
- Free(from Open Charge Map, 13 Jan 2020)
- Phone (from Open Charge Map)
- +44 800 999 4240
- Notes
- Engie rapid charger, 50kW DC, AC is a 22 Kw Socket. One bay for general use, one bay for taxis. Both Free to charge. ev.engie.co.uk £10 overstay fee after 75 mins, then £10 every subsequent 75 mins. completely free to use until 29th October 2021.
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Yeadon One Stop Centre (GeniePoint)?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at Yeadon One Stop Centre (GeniePoint)?
Up to 50 kW DC via CHAdeMO, CCS, Type 2.
How many charging sockets does Yeadon One Stop Centre (GeniePoint) have?
1 charging socket: 1 × 50 kW CHAdeMO, 1 × 50 kW CCS, 1 × 22 kW Type 2.
Who operates Yeadon One Stop Centre?
Yeadon One Stop Centre is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.
Where is the nearest other charger with 50 kW or more to Yeadon One Stop Centre (GeniePoint)?
Woolpack Inn, Leeds (Osprey Charging) is 0.5 miles away in a straight line, with up to 75 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Yeadon One Stop Centre (GeniePoint)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Yeadon One Stop Centre (GeniePoint)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Yeadon One Stop Centre (GeniePoint)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Pod Point Aldi - Yeadon
- Woolpack Inn, Leeds
- Genie
- Westside Retail Park, Leeds
- Aireborough Leisure Centre
- Aireborough Leisure Centre
- Cheapest nearby
- Pod Point Aldi - Yeadon · 25.2p per kWh · 7 kW · 0.2 mi
- Fastest nearby
- Woolpack Inn, Leeds · 75 kW · 0.5 mi