# Yeadon One Stop Centre · GeniePoint

Web page: https://ampmap.co.uk/charger/the-geniepoint-network-yeadon-one-stop-centre-uk

Yeadon One Stop Centre is an EV charging site in Yeadon, City and Borough of Leeds, run by GeniePoint. It has a single socket, with CHAdeMO and CCS at up to 50 kW, and charging is listed as free.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** High Street, LS19 7PP
- **Area:** Yeadon, City and Borough of Leeds, United Kingdom
- **Coordinates (latitude, longitude):** 53.86594, -1.68438

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 50 kW | 1 | Not listed |
| CHAdeMO | 50 kW | 1 | Not listed |
| Type 2 | 22 kW | 1 | Not listed |

- **Price:** Free (from Open Charge Map)

## Site information

- **Operator:** GeniePoint
- **Opening hours:** Not published
- **Access:** Public
- **Notes:** Engie rapid charger, 50kW DC, AC is a 22 Kw Socket. One bay for general use, one bay for taxis. Both Free to charge. ev.engie.co.uk £10 overstay fee after 75 mins, then £10 every subsequent 75 mins. completely free to use until 29th October 2021.

## Common questions

### How much does it cost to charge at Yeadon One Stop Centre (GeniePoint)?

The listed price is Free. Prices can change, so check the price at the charger before you start.

### How fast is charging at Yeadon One Stop Centre (GeniePoint)?

Up to 50 kW DC via CHAdeMO, CCS, Type 2.

### How many charging sockets does Yeadon One Stop Centre (GeniePoint) have?

1 charging socket: 1 × 50 kW CHAdeMO, 1 × 50 kW CCS, 1 × 22 kW Type 2.

### Who operates Yeadon One Stop Centre?

Yeadon One Stop Centre is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.

### How long does a Tesla Model Y Long Range take to charge at Yeadon One Stop Centre (GeniePoint)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Yeadon One Stop Centre (GeniePoint)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Yeadon One Stop Centre (GeniePoint)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Yeadon](https://ampmap.co.uk/chargers/united-kingdom/city-and-borough-of-leeds/yeadon)
- [GeniePoint chargers](https://ampmap.co.uk/networks/geniepoint)

## Chargers near this site

- [Pod Point Aldi - Yeadon](https://ampmap.co.uk/charger/pod-point-aldi-yeadon-uk) - Type 2 7 kW · Kirk Lane · From 25.2p/kWh
- [Woolpack Inn, Leeds · Osprey Charging](https://ampmap.co.uk/charger/osprey-charging-woolpack-inn-uk) - CCS 75 kW, CHAdeMO 50 kW · 18 New Road · From 89p/kWh
- [Genie · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-genie-7-uk) - CHAdeMO 50 kW, Type 2 50 kW · New Rd Side
- [Westside Retail Park, Leeds · Osprey Charging](https://ampmap.co.uk/charger/osprey-charging-westside-retail-park-uk) - CCS 50 kW, CHAdeMO 50 kW · Westside Retail Park · From 89p/kWh
- [Aireborough Leisure Centre · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-aireborough-leisure-centre-uk) - CCS 50 kW, CHAdeMO 50 kW · The Green
- [Aireborough Leisure Centre · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-aireborough-leisure-centre-2-uk) - CHAdeMO 50 kW, Type 2 50 kW · The Green, Guiseley

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/the-geniepoint-network-yeadon-one-stop-centre-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 13 Jan 2020).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
