Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

EV charging site

Three Horseshoes

High Town, Royal Leamington Spa, CV23 9PR

Three Horseshoes is an EV charging site in Royal Leamington Spa, Warwickshire. It has a single socket, with Type 2 at up to 3 kW, and charging is listed as free. No other charging site is listed within a mile, and the nearest site with 50 kW or more is Draycote Hotel (POGO), 3.5 miles away.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 16 Apr 2015Last verified 16 Apr 2015

Connectors

Type 2 · 3 kW1 connector
BS1363 3 Pin 13 Amp1 connector

Site information

Opening hours
Not published
Access
Public
Price
Free(from Open Charge Map, 16 Apr 2015)
Getting there
Just off Fosse Way

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 3 kW Type 2~18h 26m
Tesla Model 3 Rear-Wheel Drive 10–80% · 3 kW Type 2~13h 18m
Audi Q4 e-tron 50 10–80% · 3 kW Type 2~17h 2m
Hyundai IONIQ 5 10–80% · 3 kW Type 2~16h 56m
MG Motor MG4 Trophy 10–80% · 3 kW Type 2~14h 14m
Hyundai Kona Electric Long Range 10–80% · 3 kW Type 2~13h 32m
Nissan LEAF 10–80% · 3 kW Type 2~9h 20m

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Three Horseshoes?

The listed price is Free. Prices can change, so check the price at the charger before you start.

How fast is charging at Three Horseshoes?

Up to 3 kW AC via Type 2, BS1363 3 Pin 13 Amp.

How many charging sockets does Three Horseshoes have?

1 charging socket: 1 × 3 kW Type 2, 1 × BS1363 3 Pin 13 Amp.

Where is the nearest charger with 50 kW or more to Three Horseshoes?

Draycote Hotel (POGO) is 3.5 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Three Horseshoes?

A 10–80% charge takes about 18h 26m on the 3 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Three Horseshoes?

A 10–80% charge takes about 13h 18m on the 3 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Three Horseshoes?

A 10–80% charge takes about 17h 2m on the 3 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 16 Apr 2015

Amp Map does not take payment. You pay the operator.