# Wat Tyler House - Parking Bays 118 & 119 · Tonik Energy

Web page: https://ampmap.co.uk/charger/tonik-energy-wat-tyler-house-parking-bays-118-and-119-uk

Wat Tyler House - Parking Bays 118 & 119 is an EV charging site in Swindon, Borough of Swindon, run by Tonik Energy. Both of its sockets are 7 kW Type 2, and the price is listed as £0.30/kWh.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Beckhampton Street, SN2 2PN
- **Area:** Swindon, Borough of Swindon, United Kingdom
- **Coordinates (latitude, longitude):** 51.56055, -1.77859
- **Getting there:** Access available from 6am - 8pm Monday - Friday.

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 2 | Not listed |

- **Price:** £0.30/kWh (from Open Charge Map)

## Site information

- **Operator:** Tonik Energy
- **Opening hours:** Not published
- **Access:** Public

## Common questions

### How much does it cost to charge at Wat Tyler House - Parking Bays 118 & 119 (Tonik Energy)?

The listed price is £0.30/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at Wat Tyler House - Parking Bays 118 & 119 (Tonik Energy)?

Up to 7 kW AC via Type 2.

### How many charging sockets does Wat Tyler House - Parking Bays 118 & 119 (Tonik Energy) have?

2 charging sockets: 2 × 7 kW Type 2.

### Who operates Wat Tyler House - Parking Bays 118 & 119?

Wat Tyler House - Parking Bays 118 & 119 is on the Tonik Energy network.

### How long does a Tesla Model Y Long Range take to charge at Wat Tyler House - Parking Bays 118 & 119 (Tonik Energy)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Wat Tyler House - Parking Bays 118 & 119 (Tonik Energy)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Wat Tyler House - Parking Bays 118 & 119 (Tonik Energy)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Swindon](https://ampmap.co.uk/chargers/united-kingdom/borough-of-swindon/swindon)
- [Cheapest charging in Swindon](https://ampmap.co.uk/chargers/united-kingdom/borough-of-swindon/swindon/cheapest)

## Chargers near this site

- [Civic Offices · Tonik Energy](https://ampmap.co.uk/charger/tonik-energy-civic-offices-uk) - Type 2 22 kW · Euclid Street
- [Whalebridge car park](https://ampmap.co.uk/charger/whalebridge-car-park-uk) - Type 2 3 kW · Islington street
- [Premier Inn Swindon Temple Street · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-premier-inn-swindon-temple-street-uk) - Type 2 7 kW · Aspen House, Morley Street
- [Westmorland Rd · Blink Charging](https://ampmap.co.uk/charger/blink-charging-westmorland-rd-uk) - Type 2 22 kW · Westmorland Road
- [The Merlin](https://ampmap.co.uk/charger/the-merlin-uk) - Type 2 22 kW · Drove Road
- [Dixon St · Blink Charging](https://ampmap.co.uk/charger/blink-charging-dixon-st-uk) - Type 2 22 kW · Dixon St

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/tonik-energy-wat-tyler-house-parking-bays-118-and-119-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 22 Aug 2019).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
