Total Energies · EV charging site
195 Kilburn Park Road
195 Kilburn Park Road, Notting Hill, NW6 5LG
195 Kilburn Park Road is an EV charging site in Notting Hill, Greater London, run by Total Energies. Its 2 sockets reach up to 7 kW, with Type 2 at the top speed, and charging is listed as free. 1,163 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Westbourne Park Road (ESB Energy), 0.7 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- Free(from Open Charge Map, 4 Aug 2017)
- Notes
- Chargemaster post. Polar Network cards / app accepted as well as Source London.
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at 195 Kilburn Park Road (Total Energies)?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at 195 Kilburn Park Road (Total Energies)?
Up to 7 kW AC via BS1363 3 Pin 13 Amp, Type 2.
How many charging sockets does 195 Kilburn Park Road (Total Energies) have?
2 charging sockets: 1 × 3 kW BS1363 3 Pin 13 Amp, 1 × 7 kW Type 2.
Who operates 195 Kilburn Park Road?
195 Kilburn Park Road is on the Total Energies network.
Where is the nearest charger with 50 kW or more to 195 Kilburn Park Road (Total Energies)?
Westbourne Park Road (ESB Energy) is 0.7 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at 195 Kilburn Park Road (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at 195 Kilburn Park Road (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at 195 Kilburn Park Road (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. 179 Kilburn Park Road
- ubitricity Distributed Energy Systems UK Ltd. 215A Kilburn Park Road
- ubitricity Distributed Energy Systems UK Ltd. 229 Kilburn Park Road
- ubitricity Distributed Energy Systems UK Ltd. 15 Essendine Road, opp.
- ubitricity Distributed Energy Systems UK Ltd. 48 Essendine Road
- ubitricity Distributed Energy Systems UK Ltd. 22 Malvern Mews
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 179 Kilburn Park Road · 45p per kWh · 5 kW · 40 yd