Total Energies · EV charging site
2 Caxton Road
2 Caxton Road, Shepherds Bush, W12 8AJ
2 Caxton Road is an EV charging site in Shepherds Bush, Greater London, run by Total Energies. Its 2 sockets reach up to 7 kW, with Type 2 at the top speed. 1,360 other charging sites are listed within a mile, and the nearest site with 50 kW or more is London, UK - White City (Tesla), 0.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.059/minute; min £1.18; other tariffs available(from Open Charge Map, 10 Jan 2020)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at 2 Caxton Road (Total Energies)?
The listed price is £0.059/minute; min £1.18; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at 2 Caxton Road (Total Energies)?
Up to 7 kW AC via Type 2, J-1772.
How many charging sockets does 2 Caxton Road (Total Energies) have?
2 charging sockets: 1 × 7 kW Type 2, 1 × 4 kW J-1772.
Who operates 2 Caxton Road?
2 Caxton Road is on the Total Energies network.
Where is the nearest charger with 50 kW or more to 2 Caxton Road (Total Energies)?
London, UK - White City (Tesla) is 0.1 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at 2 Caxton Road (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at 2 Caxton Road (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at 2 Caxton Road (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. 18 Caxton Road, Opposite 18
- ubitricity Distributed Energy Systems UK Ltd. 2 Aldine Street, Outside 2
- ubitricity Distributed Energy Systems UK Ltd. 20 Caxton Road
- ubitricity Distributed Energy Systems UK Ltd. 39A Tadmor Street, Opposite 39A
- ubitricity Distributed Energy Systems UK Ltd. 17 Tadmor Street, Outside 17
- ubitricity Distributed Energy Systems UK Ltd. 24 Sterne Street
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 18 Caxton Road, Opposite 18 · 56p per kWh · 5 kW · 60 yd