Total Energies · EV charging site
2 Riddons Road
2 Riddons Road, Eltham, SE12 9QR
2 Riddons Road is an EV charging site in Eltham, Greater London, run by Total Energies. Its 3 sockets reach up to 7 kW, with Type 2 at the top speed. 8 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Bannatyne's Health Club - Grove Park (InstaVolt Ltd), 0.5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.059/minute; min £1.18; other tariffs available(from Open Charge Map, 23 Jul 2018)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at 2 Riddons Road (Total Energies)?
The listed price is £0.059/minute; min £1.18; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at 2 Riddons Road (Total Energies)?
Up to 7 kW AC via J-1772, Type 2.
How many charging sockets does 2 Riddons Road (Total Energies) have?
3 charging sockets: 2 × 4 kW J-1772, 2 × 7 kW Type 2.
Who operates 2 Riddons Road?
2 Riddons Road is on the Total Energies network.
Where is the nearest charger with 50 kW or more to 2 Riddons Road (Total Energies)?
Bannatyne's Health Club - Grove Park (InstaVolt Ltd) is 0.5 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at 2 Riddons Road (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at 2 Riddons Road (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at 2 Riddons Road (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. Somertrees Avenue Opposite 46
- Bannatyne's Health Club - Grove Park
- ubitricity Distributed Energy Systems UK Ltd. 624 Downham Way, opp.
- ubitricity Distributed Energy Systems UK Ltd. 67 Jevington Way
- ubitricity Distributed Energy Systems UK Ltd. 30 Jevington Way
- Toyota Bromley
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. Somertrees Avenue Opposite 46 · 56p per kWh · 5 kW · 0.4 mi
- Fastest nearby
- Bannatyne's Health Club - Grove Park · 50 kW · 0.5 mi