Total Energies · EV charging site
21 Bayonne Road
21 Bayonne Road, Fulham, W6 8EJ
21 Bayonne Road is a planned EV charging site in Fulham, Greater London, run by Total Energies. Its 4 sockets reach up to 7 kW, with Type 2 at the top speed, and charging is listed as free. 1,492 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Lille Road (Normand Park layby) (ESB Energy), 0.3 miles away.
Status
Coming soon
Listed as coming soon. Check before you travel.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- Free(from Open Charge Map, 24 Aug 2016)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at 21 Bayonne Road (Total Energies)?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at 21 Bayonne Road (Total Energies)?
Up to 7 kW AC via Type 2, J-1772.
How many charging sockets does 21 Bayonne Road (Total Energies) have?
4 charging sockets: 4 × 7 kW Type 2, 4 × 4 kW J-1772.
Who operates 21 Bayonne Road?
21 Bayonne Road is on the Total Energies network.
Where is the nearest charger with 50 kW or more to 21 Bayonne Road (Total Energies)?
Lille Road (Normand Park layby) (ESB Energy) is 0.3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at 21 Bayonne Road (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at 21 Bayonne Road (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at 21 Bayonne Road (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. Road Bayonne, Outside Twyholm Church
- ubitricity Distributed Energy Systems UK Ltd. Road Strode, Junction With Munster Road
- Strode Road
- ubitricity Distributed Energy Systems UK Ltd. 4 Strode Road, Outside 4
- ubitricity Distributed Energy Systems UK Ltd. 62 Chaldon Road, Outside 62
- Chaldon Road
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. Road Bayonne, Outside Twyholm Church · 45p per kWh · 5 kW · 30 yd