# 28 Commercial Way Se15 · Total Energies

Web page: https://ampmap.co.uk/charger/total-energies-28-commercial-way-se15-uk

28 Commercial Way Se15 is an EV charging site in Peckham, Greater London, run by Total Energies. Its 3 sockets reach up to 7 kW, with Type 2 at the top speed.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** 28 Commercial Way Se15, SE15 6UL
- **Area:** Peckham, Greater London, United Kingdom
- **Coordinates (latitude, longitude):** 51.47773, -0.06995

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 6 | Not listed |
| J-1772 | 4 kW | 6 | Not listed |

- **Price:** £0.059/minute; min £1.18; other tariffs available (from Open Charge Map)

## Site information

- **Operator:** Total Energies
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at 28 Commercial Way Se15 (Total Energies)?

The listed price is £0.059/minute; min £1.18; other tariffs available. Prices can change, so check the price at the charger before you start.

### How fast is charging at 28 Commercial Way Se15 (Total Energies)?

Up to 7 kW AC via Type 2, J-1772.

### How many charging sockets does 28 Commercial Way Se15 (Total Energies) have?

3 charging sockets: 3 × 7 kW Type 2, 3 × 4 kW J-1772, 3 × 7 kW Type 2, 3 × 4 kW J-1772.

### Who operates 28 Commercial Way Se15?

28 Commercial Way Se15 is on the Total Energies network.

### How long does a Tesla Model Y Long Range take to charge at 28 Commercial Way Se15 (Total Energies)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at 28 Commercial Way Se15 (Total Energies)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at 28 Commercial Way Se15 (Total Energies)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Peckham](https://ampmap.co.uk/chargers/united-kingdom/greater-london/peckham)
- [Cheapest charging in Peckham](https://ampmap.co.uk/chargers/united-kingdom/greater-london/peckham/cheapest)
- [Total Energies chargers](https://ampmap.co.uk/networks/total-energies)

## Chargers near this site

- [7 Buller Lane · Char.gy](https://ampmap.co.uk/charger/char-gy-7-buller-lane-uk) - Type 2 4 kW · 7 Buller Lane
- [Alloments Behind 50 Peckham Hill Street · Char.gy](https://ampmap.co.uk/charger/char-gy-alloments-behind-50-peckham-hill-street-uk) - Type 2 4 kW · Alloments Behind 50 Peckham Hill Street
- [28 Peckham Hill Street · Char.gy](https://ampmap.co.uk/charger/char-gy-28-peckham-hill-street-uk) - Type 2 5 kW · 28 Peckham Hill Street
- [38 Radnor Road · Char.gy](https://ampmap.co.uk/charger/char-gy-38-radnor-road-uk) - Type 2 4 kW · 38 Radnor Road
- [Opposite 26 Radnor Road · Char.gy](https://ampmap.co.uk/charger/char-gy-opposite-26-radnor-road-uk) - Type 2 4 kW · Opposite 26 Radnor Road
- [16 Peckham Hill Street · Char.gy](https://ampmap.co.uk/charger/char-gy-16-peckham-hill-street-uk) - Type 2 5 kW · 16 Peckham Hill Street

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/total-energies-28-commercial-way-se15-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 10 Jan 2020).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
