Total Energies · EV charging site
5 Cavendish Square
5 Cavendish Square, Soho, W1G 0PG
5 Cavendish Square is an EV charging site in Soho, Greater London, run by Total Energies. Its 3 sockets reach up to 7 kW, with Type 2 at the top speed. 361 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Albany Street, Camden (ESB Energy), 0.5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.073/minute; min £1.38; other tariffs available(from Open Charge Map, 10 Jan 2020)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at 5 Cavendish Square (Total Energies)?
The listed price is £0.073/minute; min £1.38; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at 5 Cavendish Square (Total Energies)?
Up to 7 kW AC via Type 2, J-1772.
How many charging sockets does 5 Cavendish Square (Total Energies) have?
3 charging sockets: 3 × 7 kW Type 2, 3 × 4 kW J-1772, 3 × 7 kW Type 2, 3 × 4 kW J-1772, 3 × 7 kW Type 2, 3 × 4 kW J-1772.
Who operates 5 Cavendish Square?
5 Cavendish Square is on the Total Energies network.
Where is the nearest charger with 50 kW or more to 5 Cavendish Square (Total Energies)?
Albany Street, Camden (ESB Energy) is 0.5 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at 5 Cavendish Square (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at 5 Cavendish Square (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at 5 Cavendish Square (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. 12 Chandos Street
- ubitricity Distributed Energy Systems UK Ltd. 19 Cavendish Square , o/s Harcourt House
- ubitricity Distributed Energy Systems UK Ltd. 15 Wigmore Street
- ubitricity Distributed Energy Systems UK Ltd. 13 Queen Anne Street
- ubitricity Distributed Energy Systems UK Ltd. 8 Mansfield Street
- ubitricity Distributed Energy Systems UK Ltd. 38 Harley Street
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 12 Chandos Street · 67p per kWh · 5 kW · 90 yd