Total Energies · EV charging site
Adeline Place
Adeline Place, Soho, WC1B 3AH
Adeline Place is an EV charging site in Soho, Greater London, run by Total Energies. Both of its sockets are 22 kW Type 2. 236 other charging sites are listed within a mile, and the nearest site with 50 kW or more is (Taxis Only) Russell Square (North West side) (ESB Energy), 0.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- £0.396/kWh; Idle £0.05/min; Minimum fee £0.99; other tariffs available(from Open Charge Map, 1 May 2025)
- Notes
- 22kW shared between outlets. Camden owned charge point, operated by Source London
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Adeline Place (Total Energies)?
The listed price is £0.396/kWh; Idle £0.05/min; Minimum fee £0.99; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at Adeline Place (Total Energies)?
Up to 22 kW AC via Type 2.
How many charging sockets does Adeline Place (Total Energies) have?
2 charging sockets: 1 × 22 kW Type 2, 1 × 22 kW Type 2.
Who operates Adeline Place?
Adeline Place is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Adeline Place (Total Energies)?
(Taxis Only) Russell Square (North West side) (ESB Energy) is 0.3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Adeline Place (Total Energies)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Adeline Place (Total Energies)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Adeline Place (Total Energies)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. 15 Adeline Place
- Stephens Street
- Store Street, London WC1
- ubitricity Distributed Energy Systems UK Ltd. 20 Soho Square, Opp.
- ubitricity Distributed Energy Systems UK Ltd. 21A Soho Square, Opp. Church
- Holborn NCP Car Park
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 15 Adeline Place · 56p per kWh · 5 kW · 60 yd