Total Energies · EV charging site
Arnos Grove Station
Bowes Rd, Palmers Green, N11 1AN
Arnos Grove Station is an EV charging site in Palmers Green, Greater London, run by Total Energies. All 10 of its sockets are 22 kW Type 2. 37 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Arnos Grove Station taxi charger (ESB Energy), 170 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- Free. Parking fees apply.(from Open Charge Map, 6 Jan 2018)
- Phone (from Open Charge Map)
- 0845 850 0653
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Arnos Grove Station (Total Energies)?
The listed price is Free. Parking fees apply.. Prices can change, so check the price at the charger before you start.
How fast is charging at Arnos Grove Station (Total Energies)?
Up to 22 kW AC via Type 2.
How many charging sockets does Arnos Grove Station (Total Energies) have?
10 charging sockets: 5 × 22 kW Type 2.
Who operates Arnos Grove Station?
Arnos Grove Station is on the Total Energies network. For site issues, the operator lists 0845 850 0653.
Where is the nearest charger with 50 kW or more to Arnos Grove Station (Total Energies)?
Arnos Grove Station taxi charger (ESB Energy) is 170 yards away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Arnos Grove Station (Total Energies)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Arnos Grove Station (Total Energies)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Arnos Grove Station (Total Energies)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Arnos Grove Station taxi charger
- ubitricity Distributed Energy Systems UK Ltd. 73 Ollerton Road
- ubitricity Distributed Energy Systems UK Ltd. 40 Ollerton Road
- ubitricity Distributed Energy Systems UK Ltd. 32 Evesham Road
- ubitricity Distributed Energy Systems UK Ltd. 24 Highworth Road
- ubitricity Distributed Energy Systems UK Ltd. 55 Highworth Road
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 73 Ollerton Road · 56p per kWh · 5 kW · 0.2 mi
- Fastest nearby
- Arnos Grove Station taxi charger · 50 kW · 170 yd