Total Energies · EV charging site
Arthur Road os 135 (Site 1)
Arthur Road os 135 (Site 1), Wimbledon, SW19 7DT
Arthur Road os 135 (Site 1) is an EV charging site in Wimbledon, Greater London, run by Total Energies. Its 2 sockets reach up to 7 kW, with Type 2 at the top speed. 235 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Shell Recharge EV Waitrose - Wimbledon, 0.6 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Arthur Road os 135 (Site 1) (Total Energies)?
Up to 7 kW AC via Type 2, J-1772.
How many charging sockets does Arthur Road os 135 (Site 1) (Total Energies) have?
2 charging sockets: 1 × 7 kW Type 2, 1 × 3 kW J-1772.
Who operates Arthur Road os 135 (Site 1)?
Arthur Road os 135 (Site 1) is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Arthur Road os 135 (Site 1) (Total Energies)?
Shell Recharge EV Waitrose - Wimbledon is 0.6 miles away in a straight line, with up to 120 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Arthur Road os 135 (Site 1) (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Arthur Road os 135 (Site 1) (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Arthur Road os 135 (Site 1) (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Opposite 45 Home Park Road
- ubitricity Distributed Energy Systems UK Ltd. 30 Ryfold Road, Side Of No 30
- 40 Melrose Avenue
- ubitricity Distributed Energy Systems UK Ltd. 6 The Crescent, Opposite 6
- Stroud Road
- 44 Home Park Road
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 30 Ryfold Road, Side Of No 30 · 45p per kWh · 5 kW · 170 yd