Total Energies · EV charging site
Arthur Road os 168 (Site 2)
Arthur Road os 168 (Site 2), Earlsfield, SW19 8AQ
Arthur Road os 168 (Site 2) is an EV charging site in Earlsfield, Greater London, run by Total Energies. All 3 of its sockets are 7 kW Type 2. 241 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Shell Recharge Shell Plough Lane, 0.6 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Arthur Road os 168 (Site 2) (Total Energies)?
Up to 7 kW AC via Type 2.
How many charging sockets does Arthur Road os 168 (Site 2) (Total Energies) have?
3 charging sockets: 1 × 7 kW Type 2, 1 × 7 kW Type 2, 1 × 7 kW Type 2.
Who operates Arthur Road os 168 (Site 2)?
Arthur Road os 168 (Site 2) is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Arthur Road os 168 (Site 2) (Total Energies)?
Shell Recharge Shell Plough Lane is 0.6 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Arthur Road os 168 (Site 2) (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Arthur Road os 168 (Site 2) (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Arthur Road os 168 (Site 2) (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- The Cresent
- Outside 4 Strathmore Road
- ubitricity Distributed Energy Systems UK Ltd. 6 The Crescent, Opposite 6
- Strathmore Road
- 66 the Crescent
- Farquhar Road
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 6 The Crescent, Opposite 6 · 45p per kWh · 5 kW · 110 yd