Total Energies · EV charging site
Barlby Road
141 Barlby Road, Willesden, W10 6DR
Barlby Road is an EV charging site in Willesden, Greater London, run by Total Energies. It has a single socket, with Type 2 at up to 22 kW. 781 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Scrubs Lane Car Park (ESB Energy), 0.5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.073/minute; min £1.38; other tariffs available(from Open Charge Map, 30 May 2019)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Barlby Road (Total Energies)?
The listed price is £0.073/minute; min £1.38; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at Barlby Road (Total Energies)?
Up to 22 kW AC via J-1772, Type 2.
How many charging sockets does Barlby Road (Total Energies) have?
1 charging socket: 1 × 4 kW J-1772, 1 × 7 kW Type 2, 1 × 22 kW Type 2.
Who operates Barlby Road?
Barlby Road is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Barlby Road (Total Energies)?
Scrubs Lane Car Park (ESB Energy) is 0.5 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Barlby Road (Total Energies)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Barlby Road (Total Energies)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Barlby Road (Total Energies)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. 229 Street Marks Road
- ubitricity Distributed Energy Systems UK Ltd. 219 Saint Marks Road, Opp.
- ubitricity Distributed Energy Systems UK Ltd. 4 Methwold Road
- ubitricity Distributed Energy Systems UK Ltd. 44 Hewer Street
- ubitricity Distributed Energy Systems UK Ltd. 139 Shrewsbury Street
- ubitricity Distributed Energy Systems UK Ltd. 13 Sunbeam Crescent
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 229 Street Marks Road · 56p per kWh · 5 kW · 90 yd