Total Energies · EV charging site
Bastable Avenue 342
342 Bastable Avenue, Barking, IG11 0QN
Bastable Avenue 342 is an EV charging site in Barking, Greater London, run by Total Energies. Its 3 sockets reach up to 7 kW, with Type 2 at the top speed. 6 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Shell Recharge Shell Ripple Road, 0.6 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.059/minute; min £1.18; other tariffs available(from Open Charge Map, 8 Jan 2019)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Bastable Avenue 342 (Total Energies)?
The listed price is £0.059/minute; min £1.18; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at Bastable Avenue 342 (Total Energies)?
Up to 7 kW AC via Type 2, J-1772.
How many charging sockets does Bastable Avenue 342 (Total Energies) have?
3 charging sockets: 3 × 7 kW Type 2, 3 × 4 kW J-1772.
Who operates Bastable Avenue 342?
Bastable Avenue 342 is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Bastable Avenue 342 (Total Energies)?
Shell Recharge Shell Ripple Road is 0.6 miles away in a straight line, with up to 300 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Bastable Avenue 342 (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Bastable Avenue 342 (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Bastable Avenue 342 (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Pod Point Roxwell Road-Scheme A& B
- Shell Recharge Shell Ripple Road
- Gale Street (Site 2)
- Pod Point Melish Close
- Bastable Avenue 2
- Gale Street
- Cheapest nearby
- Pod Point Roxwell Road-Scheme A& B · 39.6p per kWh · 7 kW · 0.3 mi
- Fastest nearby
- Shell Recharge Shell Ripple Road · 300 kW · 0.6 mi