# Bath Road Car Park · Total Energies

Web page: https://ampmap.co.uk/charger/total-energies-bath-road-car-park-uk

Bath Road Car Park is an EV charging site in Heston, Greater London, run by Total Energies. All 3 of its sockets are 7 kW Type 2, and charging is listed as free.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** 9 Bath Road, TW6 2AA
- **Area:** Heston, Greater London, United Kingdom
- **Coordinates (latitude, longitude):** 51.48058, -0.41988
- **Getting there:** Charges may apply - refer to the owner of the parking bay for details.

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 3 | Not listed |

- **Price:** Free (from Open Charge Map)

## Site information

- **Operator:** Total Energies
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Bath Road Car Park (Total Energies)?

The listed price is Free. Prices can change, so check the price at the charger before you start.

### How fast is charging at Bath Road Car Park (Total Energies)?

Up to 7 kW AC via Type 2.

### How many charging sockets does Bath Road Car Park (Total Energies) have?

3 charging sockets: 3 × 7 kW Type 2.

### Who operates Bath Road Car Park?

Bath Road Car Park is on the Total Energies network. For site issues, the operator lists 0845 850 0653.

### How long does a Tesla Model Y Long Range take to charge at Bath Road Car Park (Total Energies)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Bath Road Car Park (Total Energies)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Bath Road Car Park (Total Energies)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Heston](https://ampmap.co.uk/chargers/united-kingdom/greater-london/heston)
- [Cheapest charging in Heston](https://ampmap.co.uk/chargers/united-kingdom/greater-london/heston/cheapest)
- [Total Energies chargers](https://ampmap.co.uk/networks/total-energies)

## Chargers near this site

- [KFC & Starbucks · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-kfc-and-starbucks-uk) - CCS 50 kW, CHAdeMO 50 kW · Bath Road
- [Premier Inn Heathrow](https://ampmap.co.uk/charger/premier-inn-heathrow-uk) - Type 2 7 kW · Bath Road
- [Pod Point Moxy London Heathrow Airport](https://ampmap.co.uk/charger/pod-point-moxy-london-heathrow-airport-uk) - Type 2 7 kW · 804-834 Bath Road Hounslow · Free to use
- [Q-Park Heathrow · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-q-park-heathrow-uk) - CCS 300 kW, CHAdeMO 100 kW · 17 Bath Road
- [Community Cl · SureCharge](https://ampmap.co.uk/charger/surecharge-community-cl-uk) - Type 2 4 kW · Cranford
- [DRAX00212 · Drax Energy Solutions Limited](https://ampmap.co.uk/charger/drax-energy-solutions-limited-drax00212-uk) - Type 2 22 kW · Bath Road

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/total-energies-bath-road-car-park-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 5 Nov 2016).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
