Total Energies · EV charging site
Belgrave Road Car Park
Belgrave Road, South Norwood, SE25 5AL
Belgrave Road Car Park is an EV charging site in South Norwood, Greater London, run by Total Energies. It has a single 7 kW Type 2 socket, and charging is listed as free. 34 other charging sites are listed within a mile, and the nearest site with 50 kW or more is MFG South Norwood (MFG EV Power), 0.2 miles away.
Status
Out of service
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public
- Price
- Free(from Open Charge Map, 15 Dec 2017)
- Phone (from Open Charge Map)
- 0845 850 0653
- Getting there
- Charges may apply - refer to the owner of the parking bay for details.
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Belgrave Road Car Park (Total Energies)?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at Belgrave Road Car Park (Total Energies)?
Up to 7 kW AC via Type 2.
How many charging sockets does Belgrave Road Car Park (Total Energies) have?
1 charging socket: 1 × 7 kW Type 2.
Who operates Belgrave Road Car Park?
Belgrave Road Car Park is on the Total Energies network. For site issues, the operator lists 0845 850 0653.
Where is the nearest charger with 50 kW or more to Belgrave Road Car Park (Total Energies)?
MFG South Norwood (MFG EV Power) is 0.2 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Belgrave Road Car Park (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Belgrave Road Car Park (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Belgrave Road Car Park (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Fastest nearby
- MFG South Norwood · 150 kW · 0.2 mi