# Belgrave Road Car Park · Total Energies

Web page: https://ampmap.co.uk/charger/total-energies-belgrave-road-car-park-uk

Belgrave Road Car Park is an EV charging site in South Norwood, Greater London, run by Total Energies. It has a single 7 kW Type 2 socket, and charging is listed as free.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Belgrave Road, SE25 5AL
- **Area:** South Norwood, Greater London, United Kingdom
- **Coordinates (latitude, longitude):** 51.39827, -0.07502
- **Getting there:** Charges may apply - refer to the owner of the parking bay for details.

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 1 | Not listed |

- **Price:** Free (from Open Charge Map)

## Site information

- **Operator:** Total Energies
- **Opening hours:** Not published
- **Access:** Public

## Common questions

### How much does it cost to charge at Belgrave Road Car Park (Total Energies)?

The listed price is Free. Prices can change, so check the price at the charger before you start.

### How fast is charging at Belgrave Road Car Park (Total Energies)?

Up to 7 kW AC via Type 2.

### How many charging sockets does Belgrave Road Car Park (Total Energies) have?

1 charging socket: 1 × 7 kW Type 2.

### Who operates Belgrave Road Car Park?

Belgrave Road Car Park is on the Total Energies network. For site issues, the operator lists 0845 850 0653.

### How long does a Tesla Model Y Long Range take to charge at Belgrave Road Car Park (Total Energies)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Belgrave Road Car Park (Total Energies)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Belgrave Road Car Park (Total Energies)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in South Norwood](https://ampmap.co.uk/chargers/united-kingdom/greater-london/south-norwood)
- [Total Energies chargers](https://ampmap.co.uk/networks/total-energies)

## Chargers near this site

- [Clifford Road · Char.gy](https://ampmap.co.uk/charger/char-gy-clifford-road-uk) - Type 2 3 kW · Clifford Road
- [SVS House · Char.gy](https://ampmap.co.uk/charger/char-gy-svs-house-uk) - Type 2 4 kW · SVS House
- [Gresham Road · Char.gy](https://ampmap.co.uk/charger/char-gy-gresham-road-uk) - Type 2 3 kW · Gresham Road
- [Crowther Road · Believ](https://ampmap.co.uk/charger/believ-crowther-road-uk) - Type 2 22 kW · Crowther Road
- [MFG South Norwood · MFG EV Power](https://ampmap.co.uk/charger/mfg-ev-power-mfg-south-norwood-uk) - CCS 150 kW, CHAdeMO 50 kW · 399 Holmesdale Road
- [Opposite 64 Carmichael Road · Char.gy](https://ampmap.co.uk/charger/char-gy-opposite-64-carmichael-road-uk) - Type 2 5 kW · Opposite 64 Carmichael Road

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/total-energies-belgrave-road-car-park-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 15 Dec 2017).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
