Total Energies · EV charging site
Belgrave Square 5
5 Belgrave Square, City of Westminster, SW1X 8PH
Belgrave Square 5 is an EV charging site in City of Westminster, Greater London, run by Total Energies. Its 5 sockets reach up to 7 kW, with Type 2 at the top speed. 397 other charging sites are listed within a mile, and the nearest site with 50 kW or more is 2 Belgrave Square, Westminster (ESB Energy), 70 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.073/minute; min £1.38; other tariffs available(from Open Charge Map, 12 May 2019)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Belgrave Square 5 (Total Energies)?
The listed price is £0.073/minute; min £1.38; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at Belgrave Square 5 (Total Energies)?
Up to 7 kW AC via Type 2, J-1772.
How many charging sockets does Belgrave Square 5 (Total Energies) have?
5 charging sockets: 5 × 7 kW Type 2, 5 × 4 kW J-1772.
Who operates Belgrave Square 5?
Belgrave Square 5 is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Belgrave Square 5 (Total Energies)?
2 Belgrave Square, Westminster (ESB Energy) is 70 yards away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Belgrave Square 5 (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Belgrave Square 5 (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Belgrave Square 5 (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. 10 Belgrave Square, opp.
- 2 Belgrave Square, Westminster
- ubitricity Distributed Energy Systems UK Ltd. 47 Belgrave Square, opp 47
- ubitricity Distributed Energy Systems UK Ltd. 11 Wilton Terrace Opp
- ubitricity Distributed Energy Systems UK Ltd. 43 Belgrave Square, opp 43
- ubitricity Distributed Energy Systems UK Ltd. 18 Belgrave square
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 10 Belgrave Square, opp. · 67p per kWh · 5 kW · 50 yd
- Fastest nearby
- 2 Belgrave Square, Westminster · 50 kW · 70 yd