# Blackheath Grove Car Park · Total Energies

Web page: https://ampmap.co.uk/charger/total-energies-blackheath-grove-car-park-uk

Blackheath Grove Car Park is an EV charging site in Blackheath, Greater London, run by Total Energies. It has a single socket, with Type 2 at up to 7 kW.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** St Josephs Vale, SE3 0TE
- **Area:** Blackheath, Greater London, United Kingdom
- **Coordinates (latitude, longitude):** 51.46673, 0.00989

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 1 | Not listed |
| J-1772 | 4 kW | 1 | Not listed |

- **Price:** £0.059/minute; min £1.18; other tariffs available. Parking fees apply. (from Open Charge Map)

## Site information

- **Operator:** Total Energies
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Blackheath Grove Car Park (Total Energies)?

The listed price is £0.059/minute; min £1.18; other tariffs available. Parking fees apply.. Prices can change, so check the price at the charger before you start.

### How fast is charging at Blackheath Grove Car Park (Total Energies)?

Up to 7 kW AC via J-1772, Type 2.

### How many charging sockets does Blackheath Grove Car Park (Total Energies) have?

1 charging socket: 1 × 4 kW J-1772, 1 × 7 kW Type 2.

### Who operates Blackheath Grove Car Park?

Blackheath Grove Car Park is on the Total Energies network.

### How long does a Tesla Model Y Long Range take to charge at Blackheath Grove Car Park (Total Energies)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Blackheath Grove Car Park (Total Energies)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Blackheath Grove Car Park (Total Energies)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Blackheath](https://ampmap.co.uk/chargers/united-kingdom/greater-london/blackheath)
- [Cheapest charging in Blackheath](https://ampmap.co.uk/chargers/united-kingdom/greater-london/blackheath/cheapest)
- [Total Energies chargers](https://ampmap.co.uk/networks/total-energies)

## Chargers near this site

- [ubitricity Distributed Energy Systems UK Ltd. 30 Blackheath Vale, Junc. Duke Humphrey Road](https://ampmap.co.uk/charger/ubitricity-30-blackheath-vale-junc-duke-humphrey-road-uk) - Ubitricity · Type 2 5 kW · 30 Blackheath Vale, Junc. Duke Humphrey Road · From 45p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. 65 Quentin Road](https://ampmap.co.uk/charger/ubitricity-65-quentin-road-uk) - Ubitricity · Type 2 5 kW · 65 Quentin Road · From 45p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. 19 Eton Grove, Opp.](https://ampmap.co.uk/charger/ubitricity-19-eton-grove-opp-uk) - Ubitricity · Type 2 5 kW · 19 Eton Grove, Opp. · From 45p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. 170 Dacre Park](https://ampmap.co.uk/charger/ubitricity-170-dacre-park-uk) - Ubitricity · Type 2 5 kW · 170 Dacre Park · From 45p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. 50 Belmont Park](https://ampmap.co.uk/charger/ubitricity-50-belmont-park-uk) - Ubitricity · Type 2 5 kW · 50 Belmont Park · From 45p/kWh
- [MFG Blackheath · MFG EV Power](https://ampmap.co.uk/charger/mfg-ev-power-mfg-blackheath-uk) - CCS 50 kW, CHAdeMO 50 kW · 37A Shooters Hill Road

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/total-energies-blackheath-grove-car-park-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 27 Apr 2017).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
