# Blurton Road · Total Energies

Web page: https://ampmap.co.uk/charger/total-energies-blurton-road-uk

Blurton Road is an EV charging site in Stamford Hill, Greater London, run by Total Energies. Its 3 sockets reach up to 7 kW, with Type 2 at the top speed.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** 48 Blurton Road, E5 0NH
- **Area:** Stamford Hill, Greater London, United Kingdom
- **Coordinates (latitude, longitude):** 51.55355, -0.04627

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 3 | Not listed |
| J-1772 | 4 kW | 3 | Not listed |

- **Price:** £0.059/minute; min £1.18; other tariffs available (from Open Charge Map)

## Site information

- **Operator:** Total Energies
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Blurton Road (Total Energies)?

The listed price is £0.059/minute; min £1.18; other tariffs available. Prices can change, so check the price at the charger before you start.

### How fast is charging at Blurton Road (Total Energies)?

Up to 7 kW AC via Type 2, J-1772.

### How many charging sockets does Blurton Road (Total Energies) have?

3 charging sockets: 3 × 7 kW Type 2, 3 × 4 kW J-1772.

### Who operates Blurton Road?

Blurton Road is on the Total Energies network.

### How long does a Tesla Model Y Long Range take to charge at Blurton Road (Total Energies)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Blurton Road (Total Energies)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Blurton Road (Total Energies)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Stamford Hill](https://ampmap.co.uk/chargers/united-kingdom/greater-london/stamford-hill)
- [Total Energies chargers](https://ampmap.co.uk/networks/total-energies)

## Chargers near this site

- [Homertown Grove · Total Energies](https://ampmap.co.uk/charger/total-energies-homertown-grove-uk) - BS1363 3 Pin 13 Amp 4 kW, Unknown · Homertown Grove
- [Millfields Road · Total Energies](https://ampmap.co.uk/charger/total-energies-millfields-road-uk) - Type 2 7 kW, J-1772 4 kW · 234 Millfields Road
- [Wattisfield Road Site 3 · Total Energies](https://ampmap.co.uk/charger/total-energies-wattisfield-road-site-3-uk) - Type 2 7 kW, J-1772 3 kW · Wattisfield Road Site 3
- [Cornthwaite Rd Cornthwaite Rd · Total Energies](https://ampmap.co.uk/charger/total-energies-cornthwaite-rd-cornthwaite-rd-uk) - Type 2 7 kW · Cornthwaite Rd Cornthwaite Rd
- [Wattisfield Road · Total Energies](https://ampmap.co.uk/charger/total-energies-wattisfield-road-uk) - Type 2 7 kW, J-1772 4 kW · 2 Wattisfield Road
- [Hackney Council Service Centre · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-hackney-council-service-centre-2-uk) - CCS 50 kW, CHAdeMO 50 kW · Reading Lane

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/total-energies-blurton-road-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 27 Apr 2017).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
