Total Energies · EV charging site
Bocking Street
Bocking Street, Bethnal Green, E8 4RU
Bocking Street is an EV charging site in Bethnal Green, Greater London, run by Total Energies. It has a single socket, with Type 2 at up to 7 kW. 355 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Hackney Council Service Centre (GeniePoint), 0.5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.059/minute; min £1.18; other tariffs available(from Open Charge Map, 27 Apr 2017)
- Notes
- IER charge point. J1172 connection only really usable by vehicles with charge inlet on rear / right of vehicle due to placement of charge point at the back of the parking bay.
- Getting there
- J1172 connection only really usable by vehicles with charge inlet on rear / right of vehicle due to placement of charge point at the back of the parking bay, and it is a one-way road.
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Bocking Street (Total Energies)?
The listed price is £0.059/minute; min £1.18; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at Bocking Street (Total Energies)?
Up to 7 kW AC via Type 2, J-1772.
How many charging sockets does Bocking Street (Total Energies) have?
1 charging socket: 1 × 7 kW Type 2, 1 × 4 kW J-1772.
Who operates Bocking Street?
Bocking Street is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Bocking Street (Total Energies)?
Hackney Council Service Centre (GeniePoint) is 0.5 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Bocking Street (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Bocking Street (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Bocking Street (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Victoria Park Road
- ubitricity Distributed Energy Systems UK Ltd. 61 Vyner Street
- ubitricity Distributed Energy Systems UK Ltd. 1 Vyner Street
- Clermont Road
- Wadeson Street
- ubitricity Distributed Energy Systems UK Ltd. 33 Wadeson Street
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 61 Vyner Street · 55p per kWh · 5 kW · 0.2 mi