Total Energies · EV charging site
Borough Market Car Park
8 Southwark Street, London, SE1 1TL
Borough Market Car Park is an EV charging site in London, Greater London, run by Total Energies. All 4 of its sockets are 7 kW Type 2. 192 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Southwark Street, 0.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- Free. Parking fees apply.(from Open Charge Map, 3 Nov 2016)
- Phone (from Open Charge Map)
- 0845 850 0653
- Getting there
- Parking charges apply Mo-Fr 09:45-17:15 Sa 07:45-17:15 £4 for up to 2 hours. Max stay 2 hours.
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Borough Market Car Park (Total Energies)?
The listed price is Free. Parking fees apply.. Prices can change, so check the price at the charger before you start.
How fast is charging at Borough Market Car Park (Total Energies)?
Up to 7 kW AC via Type 2.
How many charging sockets does Borough Market Car Park (Total Energies) have?
4 charging sockets: 4 × 7 kW Type 2.
Who operates Borough Market Car Park?
Borough Market Car Park is on the Total Energies network. For site issues, the operator lists 0845 850 0653.
Where is the nearest charger with 50 kW or more to Borough Market Car Park (Total Energies)?
Southwark Street is 0.1 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Borough Market Car Park (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Borough Market Car Park (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Borough Market Car Park (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Southwark Street
- [E-TAXI ONLY] 49 Southwark Street
- [E-TAXI ONLY] 48 Southwark Street
- DRAX00197
- [E-TAXI ONLY] 64 Southwark Street
- Opposite Octavia House
- Fastest nearby
- Southwark Street · 50 kW · 0.1 mi