# Borough Market Car Park · Total Energies

Web page: https://ampmap.co.uk/charger/total-energies-borough-market-car-park-uk

Borough Market Car Park is an EV charging site in London, Greater London, run by Total Energies. All 4 of its sockets are 7 kW Type 2.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** 8 Southwark Street, SE1 1TL
- **Area:** London, Greater London, United Kingdom
- **Coordinates (latitude, longitude):** 51.50602, -0.09093
- **Getting there:** Parking charges apply Mo-Fr 09:45-17:15 Sa 07:45-17:15 £4 for up to 2 hours. Max stay 2 hours.

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 4 | Not listed |

- **Price:** Free. Parking fees apply. (from Open Charge Map)

## Site information

- **Operator:** Total Energies
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Borough Market Car Park (Total Energies)?

The listed price is Free. Parking fees apply.. Prices can change, so check the price at the charger before you start.

### How fast is charging at Borough Market Car Park (Total Energies)?

Up to 7 kW AC via Type 2.

### How many charging sockets does Borough Market Car Park (Total Energies) have?

4 charging sockets: 4 × 7 kW Type 2.

### Who operates Borough Market Car Park?

Borough Market Car Park is on the Total Energies network. For site issues, the operator lists 0845 850 0653.

### How long does a Tesla Model Y Long Range take to charge at Borough Market Car Park (Total Energies)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Borough Market Car Park (Total Energies)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Borough Market Car Park (Total Energies)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in London](https://ampmap.co.uk/chargers/united-kingdom/greater-london/london)
- [Cheapest charging in London](https://ampmap.co.uk/chargers/united-kingdom/greater-london/london/cheapest)
- [Total Energies chargers](https://ampmap.co.uk/networks/total-energies)

## Chargers near this site

- [Southwark Street](https://ampmap.co.uk/charger/southwark-street-uk) - CCS 50 kW, CHAdeMO 50 kW
- [\[E-TAXI ONLY\] 49 Southwark Street · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-49-southwark-street-uk) - CCS 50 kW, CHAdeMO 50 kW · 49 Southwark Street
- [\[E-TAXI ONLY\] 48 Southwark Street · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-48-southwark-street-uk) - CCS 50 kW · 48 Southwark Street
- [DRAX00197 · Drax Energy Solutions Limited](https://ampmap.co.uk/charger/drax-energy-solutions-limited-drax00197-uk) - Type 2 22 kW · Southwark Bridge Road
- [\[E-TAXI ONLY\] 64 Southwark Street · BP Pulse](https://ampmap.co.uk/charger/chargemaster-64-southwark-street-e-taxis-only-uk) - CCS 50 kW, CHAdeMO 50 kW · 64 Southwark Street
- [Opposite Octavia House · Char.gy](https://ampmap.co.uk/charger/char-gy-opposite-octavia-house-uk) - Type 2 5 kW · Opposite Octavia House

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/total-energies-borough-market-car-park-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 3 Nov 2016).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
