Total Energies · EV charging site
Brentford High Street Car Park
Brentford High Street Car Park, Ealing Common, TW8 0NG
Brentford High Street Car Park is an EV charging site in Ealing Common, Greater London (TW8 0NG), run by Total Energies. Its 2 sockets reach up to 7 kW, with Type 2 at the top speed. Amp Map lists 1 other charge point named Brentford High Street Car Park in Ealing Common. 105 other charging sites are listed within a mile, and the nearest site with 50 kW or more is McDonald's Brentford (InstaVolt Ltd), 110 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Brentford High Street Car Park (Total Energies)?
Up to 7 kW AC via J-1772, Type 2.
How many charging sockets does Brentford High Street Car Park (Total Energies) have?
2 charging sockets: 1 × 3 kW J-1772, 1 × 7 kW Type 2.
Who operates Brentford High Street Car Park?
Brentford High Street Car Park is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Brentford High Street Car Park (Total Energies)?
McDonald's Brentford (InstaVolt Ltd) is 110 yards away in a straight line, with up to 63 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Brentford High Street Car Park (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Brentford High Street Car Park (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Brentford High Street Car Park (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. 5 Mafeking Avenue, Adjacent To No. 5 Market T
- Brentford High Street Car Park
- McDonald's Brentford
- ubitricity Distributed Energy Systems UK Ltd. 37-38 Grosvenor Road, Outside Nos 37 38
- Grosvenor Road
- ubitricity Distributed Energy Systems UK Ltd. 26 Grosvenor Road, Outside 26
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 5 Mafeking Avenue, Adjacent To No. 5 Market T · 45p per kWh · 5 kW · 60 yd
- Fastest nearby
- McDonald's Brentford · 63 kW · 110 yd