Total Energies · EV charging site
Bromley NCP - The Mall
Elmfield Road, Hayes, BR1 1TR
Bromley NCP - The Mall is an EV charging site in Hayes, Greater London, run by Total Energies. Both of its sockets are 7 kW Type 2. 11 other charging sites are listed within a mile, and the nearest site with 50 kW or more is London, UK - Bromley (Tesla), 0.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- Free. Parking fees apply.(from Open Charge Map, 5 Nov 2016)
- Phone (from Open Charge Map)
- 0845 850 0653
- Getting there
- Charges may apply - refer to the owner of the parking bay for details.
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Bromley NCP - The Mall (Total Energies)?
The listed price is Free. Parking fees apply.. Prices can change, so check the price at the charger before you start.
How fast is charging at Bromley NCP - The Mall (Total Energies)?
Up to 7 kW AC via Type 2.
How many charging sockets does Bromley NCP - The Mall (Total Energies) have?
2 charging sockets: 2 × 7 kW Type 2.
Who operates Bromley NCP - The Mall?
Bromley NCP - The Mall is on the Total Energies network. For site issues, the operator lists 0845 850 0653.
Where is the nearest charger with 50 kW or more to Bromley NCP - The Mall (Total Energies)?
London, UK - Bromley (Tesla) is 0.2 miles away in a straight line, with up to 250 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Bromley NCP - The Mall (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Bromley NCP - The Mall (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Bromley NCP - The Mall (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- The Glades Shopping Centre
- Elmfield Park Road
- Bromley Civic Centre Car Park
- London, UK - Bromley
- Civic Centre Car Park (Stockwell Close)
- Hill Car Park(Site 2)
- Cheapest nearby
- London, UK - Bromley · 40p per kWh · 250 kW · 0.2 mi
- Fastest nearby
- London, UK - Bromley · 250 kW · 0.2 mi