# Bromley NCP - The Mall · Total Energies

Web page: https://ampmap.co.uk/charger/total-energies-bromley-ncp-the-mall-uk

Bromley NCP - The Mall is an EV charging site in Hayes, Greater London, run by Total Energies. Both of its sockets are 7 kW Type 2.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Elmfield Road, BR1 1TR
- **Area:** Hayes, Greater London, United Kingdom
- **Coordinates (latitude, longitude):** 51.40228, 0.01677
- **Getting there:** Charges may apply - refer to the owner of the parking bay for details.

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 2 | Not listed |

- **Price:** Free. Parking fees apply. (from Open Charge Map)

## Site information

- **Operator:** Total Energies
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Bromley NCP - The Mall (Total Energies)?

The listed price is Free. Parking fees apply.. Prices can change, so check the price at the charger before you start.

### How fast is charging at Bromley NCP - The Mall (Total Energies)?

Up to 7 kW AC via Type 2.

### How many charging sockets does Bromley NCP - The Mall (Total Energies) have?

2 charging sockets: 2 × 7 kW Type 2.

### Who operates Bromley NCP - The Mall?

Bromley NCP - The Mall is on the Total Energies network. For site issues, the operator lists 0845 850 0653.

### How long does a Tesla Model Y Long Range take to charge at Bromley NCP - The Mall (Total Energies)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Bromley NCP - The Mall (Total Energies)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Bromley NCP - The Mall (Total Energies)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Hayes](https://ampmap.co.uk/chargers/united-kingdom/greater-london/hayes)
- [Cheapest charging in Hayes](https://ampmap.co.uk/chargers/united-kingdom/greater-london/hayes/cheapest)
- [Total Energies chargers](https://ampmap.co.uk/networks/total-energies)

## Chargers near this site

- [The Glades Shopping Centre · Elektromotive](https://ampmap.co.uk/charger/elektromotive-the-glades-shopping-centre-uk) - BS1363 3 Pin 13 Amp 3 kW · High Street
- [Elmfield Park Road · Total Energies](https://ampmap.co.uk/charger/total-energies-elmfield-park-road-uk) - Type 2 22 kW, J-1772 4 kW · Elmfield Road South Junction Elmfield Park
- [Bromley Civic Centre Car Park · Total Energies](https://ampmap.co.uk/charger/total-energies-bromley-civic-centre-car-park-uk) - Type 2 7 kW, J-1772 4 kW · Stockwell Close
- [London, UK - Bromley · Tesla](https://ampmap.co.uk/charger/tesla-london-uk-bromley-uk) - CCS 250 kW · Stockwell Cl · From 40p/kWh
- [Civic Centre Car Park (Stockwell Close) · Total Energies](https://ampmap.co.uk/charger/total-energies-civic-centre-car-park-stockwell-close-uk) - Type 2 7 kW, J-1772 3 kW · Civic Centre Car Park (Stockwell Close)
- [Hill Car Park(Site 2) · Total Energies](https://ampmap.co.uk/charger/total-energies-hill-car-park-site-2-uk) - Type 2 7 kW, J-1772 3 kW · Hill Car Park(Site 2)

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/total-energies-bromley-ncp-the-mall-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 5 Nov 2016).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
