# Bunns Lane Car Park · Total Energies

Web page: https://ampmap.co.uk/charger/total-energies-bunns-lane-car-park-uk

Bunns Lane Car Park is an EV charging site in Finchley, Greater London, run by Total Energies. Its 2 sockets reach up to 7 kW, with Type 2 at the top speed.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Bunns Lane, NW7 2GD
- **Area:** Finchley, Greater London, United Kingdom
- **Coordinates (latitude, longitude):** 51.61261, -0.24939

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 2 | Not listed |
| J-1772 | 4 kW | 2 | Not listed |

- **Price:** £0.69/kWh.; Idle £0.05/min; other tariffs available. Parking fees apply. (from Open Charge Map)

## Site information

- **Operator:** Total Energies
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Bunns Lane Car Park (Total Energies)?

The listed price is £0.69/kWh.; Idle £0.05/min; other tariffs available. Parking fees apply.. Prices can change, so check the price at the charger before you start.

### How fast is charging at Bunns Lane Car Park (Total Energies)?

Up to 7 kW AC via Type 2, J-1772.

### How many charging sockets does Bunns Lane Car Park (Total Energies) have?

2 charging sockets: 1 × 7 kW Type 2, 1 × 4 kW J-1772, 1 × 7 kW Type 2, 1 × 4 kW J-1772.

### Who operates Bunns Lane Car Park?

Bunns Lane Car Park is on the Total Energies network.

### How long does a Tesla Model Y Long Range take to charge at Bunns Lane Car Park (Total Energies)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Bunns Lane Car Park (Total Energies)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Bunns Lane Car Park (Total Energies)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Finchley](https://ampmap.co.uk/chargers/united-kingdom/greater-london/finchley)
- [Cheapest charging in Finchley](https://ampmap.co.uk/chargers/united-kingdom/greater-london/finchley/cheapest)
- [Total Energies chargers](https://ampmap.co.uk/networks/total-energies)

## Chargers near this site

- [Pod Point Sacred Heart Church - Mill Hill](https://ampmap.co.uk/charger/pod-point-sacred-heart-church-mill-hill-uk) - Type 2 7 kW · Sacred Heart Church · From 85.2p/kWh
- [Shell Recharge Shell Mill Hill](https://ampmap.co.uk/charger/shell-recharge-shell-mill-hill-uk) - CCS 400 kW · Shell Barnet Way · From 89p/kWh
- [Pod Point Nissan WLMG Mill Hill](https://ampmap.co.uk/charger/pod-point-nissan-wlmg-mill-hill-uk) - Type 2 7 kW · 517 Watford Way · Free to use
- [West Way Nissan Mill Hill · Nissan UK Dealer Network](https://ampmap.co.uk/charger/nissan-uk-dealer-network-west-way-nissan-mill-hill-uk) - Type 2 7 kW · 517 Watford Way
- [hub\_l001801\_cs\_01 · Trojan Energy](https://ampmap.co.uk/charger/trojan-energy-hub-l001801-cs-01-uk) - Type 2 22 kW · Watling Avenue
- [hub\_l001601\_cs\_01 · Trojan Energy](https://ampmap.co.uk/charger/trojan-energy-hub-l001601-cs-01-uk) - Type 2 22 kW · Gloucester Grove

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/total-energies-bunns-lane-car-park-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 3 Oct 2022).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
