Total Energies · EV charging site
Calderwood Street Car Park Site 2
Calderwood Street Car Park Site 2, Plumstead, SE18 6QW
Calderwood Street Car Park Site 2 is an EV charging site in Plumstead, Greater London, run by Total Energies. Its 2 sockets reach up to 7 kW, with Type 2 at the top speed. 53 other charging sites are listed within a mile, and the nearest site with 50 kW or more is John Wilson Street (Charge Your Car), 0.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Calderwood Street Car Park Site 2 (Total Energies)?
Up to 7 kW AC via J-1772, Type 2.
How many charging sockets does Calderwood Street Car Park Site 2 (Total Energies) have?
2 charging sockets: 1 × 3 kW J-1772, 1 × 7 kW Type 2.
Who operates Calderwood Street Car Park Site 2?
Calderwood Street Car Park Site 2 is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Calderwood Street Car Park Site 2 (Total Energies)?
John Wilson Street (Charge Your Car) is 0.1 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Calderwood Street Car Park Site 2 (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Calderwood Street Car Park Site 2 (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Calderwood Street Car Park Site 2 (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Calderwood Car Park
- Market Street, Greenwich
- John Wilson Street
- ubitricity Distributed Energy Systems UK Ltd. 17-39 Charles Grinling Walk
- Pod Point Tesco Extra - Woolwich
- Glass Yard Charging Hub
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 17-39 Charles Grinling Walk · 44p per kWh · 5 kW · 0.1 mi
- Fastest nearby
- John Wilson Street · 50 kW · 0.1 mi