Total Energies · EV charging site
Cedar Road CP
Cedar Road Car Park, Hampton, TW11 9AN
Cedar Road CP is an EV charging site in Hampton, Greater London, run by Total Energies. Its 5 sockets reach up to 7 kW, with Type 2 at the top speed. 130 other charging sites are listed within a mile, and the nearest site with 50 kW or more is London, UK - Kingston Upon Thames (Tesla), 1.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.059/minute; min £1.18; other tariffs available(from Open Charge Map, 1 Apr 2019)
- Phone (from Open Charge Map)
- + 44 (0)1273 704775
- Notes
- Two hour limit applies. Richmond Council's residents charging scheme
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Cedar Road CP (Total Energies)?
The listed price is £0.059/minute; min £1.18; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at Cedar Road CP (Total Energies)?
Up to 7 kW AC via Type 2, J-1772.
How many charging sockets does Cedar Road CP (Total Energies) have?
5 charging sockets: 5 × 7 kW Type 2, 5 × 4 kW J-1772.
Who operates Cedar Road CP?
Cedar Road CP is on the Total Energies network. For site issues, the operator lists + 44 (0)1273 704775.
Where is the nearest charger with 50 kW or more to Cedar Road CP (Total Energies)?
London, UK - Kingston Upon Thames (Tesla) is 1.4 miles away in a straight line, with up to 250 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Cedar Road CP (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Cedar Road CP (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Cedar Road CP (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. 1 Springfield Road, Junc. Field Lane
- ubitricity Distributed Energy Systems UK Ltd. 10 Springfield Road
- ubitricity Distributed Energy Systems UK Ltd. 25 Springfield Road
- Elmfield Avenue Site 2
- ubitricity Distributed Energy Systems UK Ltd. 40 Springfield Road
- ubitricity Distributed Energy Systems UK Ltd. 37 Cambridge Crescent
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 1 Springfield Road, Junc. Field Lane · 67p per kWh · 5 kW · 100 yd