Total Energies · EV charging site
Chantry Street (B)
29 Chantry Street (B), Islington, N1 8NR
Chantry Street (B) is an EV charging site in Islington, Greater London, run by Total Energies. Its 2 sockets reach up to 7 kW, with Type 2 at the top speed. 193 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Shell Recharge Shell Upper Street, 0.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.059/minute; min £1.18; other tariffs available(from Open Charge Map, 10 Jan 2020)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Chantry Street (B) (Total Energies)?
The listed price is £0.059/minute; min £1.18; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at Chantry Street (B) (Total Energies)?
Up to 7 kW AC via Type 2, J-1772.
How many charging sockets does Chantry Street (B) (Total Energies) have?
2 charging sockets: 2 × 7 kW Type 2, 2 × 4 kW J-1772, 2 × 7 kW Type 2.
Who operates Chantry Street (B)?
Chantry Street (B) is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Chantry Street (B) (Total Energies)?
Shell Recharge Shell Upper Street is 0.4 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Chantry Street (B) (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Chantry Street (B) (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Chantry Street (B) (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. 122 Packington Street
- Chantry Street
- ubitricity Distributed Energy Systems UK Ltd. 27 Packington Street
- ubitricity Distributed Energy Systems UK Ltd. 17 Packington Street
- ubitricity Distributed Energy Systems UK Ltd. 25 Burgh Street
- ubitricity Distributed Energy Systems UK Ltd. 30 Burgh Street
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 122 Packington Street · 56p per kWh · 5 kW · 150 yd