Total Energies · EV charging site
Chapter Road
294 Chapter Road, Harlesden, NW2 5NE
Chapter Road is an EV charging site in Harlesden, Greater London, run by Total Energies. It has a single socket, with Type 2 at up to 7 kW. 237 other charging sites are listed within a mile, and the nearest site with 50 kW or more is 252 Neasden Lane, 0.7 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.059/minute; min £1.18; other tariffs available(from Open Charge Map, 8 Jan 2019)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Chapter Road (Total Energies)?
The listed price is £0.059/minute; min £1.18; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at Chapter Road (Total Energies)?
Up to 7 kW AC via Type 2, J-1772.
How many charging sockets does Chapter Road (Total Energies) have?
1 charging socket: 1 × 7 kW Type 2, 1 × 4 kW J-1772.
Who operates Chapter Road?
Chapter Road is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Chapter Road (Total Energies)?
252 Neasden Lane is 0.7 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Chapter Road (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Chapter Road (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Chapter Road (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. 204 Villiers Road
- ubitricity Distributed Energy Systems UK Ltd. 200 Villiers Road
- ubitricity Distributed Energy Systems UK Ltd. 182A Villiers Road
- ubitricity Distributed Energy Systems UK Ltd. 125 Villiers Road
- ubitricity Distributed Energy Systems UK Ltd. 141 Denzil Road
- ubitricity Distributed Energy Systems UK Ltd. 135A Denzil Road
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 204 Villiers Road · 45p per kWh · 5 kW · 110 yd