# Cheam Street · Total Energies

Web page: https://ampmap.co.uk/charger/total-energies-cheam-street-uk

Cheam Street is an EV charging site in Peckham, Greater London, run by Total Energies. It has a single socket, with Type 2 at up to 7 kW.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Cheam Street, SE15 3QF
- **Area:** Peckham, Greater London, United Kingdom
- **Coordinates (latitude, longitude):** 51.46529, -0.05837
- **Getting there:** Charges may apply - refer to the owner of the parking bay for details.

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 1 | Not listed |
| J-1772 | 4 kW | 1 | Not listed |

- **Price:** £0.059/minute; min £1.18; other tariffs available (from Open Charge Map)

## Site information

- **Operator:** Total Energies
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required
- **Notes:** IER model charge point

## Common questions

### How much does it cost to charge at Cheam Street (Total Energies)?

The listed price is £0.059/minute; min £1.18; other tariffs available. Prices can change, so check the price at the charger before you start.

### How fast is charging at Cheam Street (Total Energies)?

Up to 7 kW AC via Type 2, J-1772.

### How many charging sockets does Cheam Street (Total Energies) have?

1 charging socket: 1 × 7 kW Type 2, 1 × 4 kW J-1772.

### Who operates Cheam Street?

Cheam Street is on the Total Energies network. For site issues, the operator lists 0845 850 0653.

### How long does a Tesla Model Y Long Range take to charge at Cheam Street (Total Energies)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Cheam Street (Total Energies)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Cheam Street (Total Energies)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Peckham](https://ampmap.co.uk/chargers/united-kingdom/greater-london/peckham)
- [Cheapest charging in Peckham](https://ampmap.co.uk/chargers/united-kingdom/greater-london/peckham/cheapest)
- [Total Energies chargers](https://ampmap.co.uk/networks/total-energies)

## Chargers near this site

- [221 Gordon Road · Char.gy](https://ampmap.co.uk/charger/char-gy-221-gordon-road-uk) - Type 2 4 kW · 221 Gordon Road
- [7 Nunhead Grove · Char.gy](https://ampmap.co.uk/charger/char-gy-7-nunhead-grove-uk) - Type 2 5 kW · 7 Nunhead Grove
- [105 Scylla Road · Char.gy](https://ampmap.co.uk/charger/char-gy-105-scylla-road-uk) - Type 2 4 kW · 105 Scylla Road
- [Tappesfield Estate · Char.gy](https://ampmap.co.uk/charger/char-gy-tappesfield-estate-uk) - Type 2 5 kW · Tappesfield Estate
- [211 Consort Road · Char.gy](https://ampmap.co.uk/charger/char-gy-211-consort-road-uk) - Type 2 4 kW · 211 Consort Road
- [New James Court · Char.gy](https://ampmap.co.uk/charger/char-gy-new-james-court-uk) - Type 2 5 kW · New James Court

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/total-energies-cheam-street-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 27 Apr 2017).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
