Total Energies · EV charging site
Chelsea Embankment site 2
Chelsea Embankment site 2, SW3 4LA
Chelsea Embankment site 2 is an EV charging site in Chelsea, Greater London, run by Total Energies. Its 2 sockets reach up to 7 kW, with Type 2 at the top speed. 342 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Oakley street (BP Pulse), 0.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Chelsea Embankment site 2 (Total Energies)?
Up to 7 kW AC via J-1772, Type 2.
How many charging sockets does Chelsea Embankment site 2 (Total Energies) have?
2 charging sockets: 1 × 3 kW J-1772, 1 × 7 kW Type 2.
Who operates Chelsea Embankment site 2?
Chelsea Embankment site 2 is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Chelsea Embankment site 2 (Total Energies)?
Oakley street (BP Pulse) is 0.2 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Chelsea Embankment site 2 (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Chelsea Embankment site 2 (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Chelsea Embankment site 2 (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Chelsea Embankment
- ubitricity Distributed Energy Systems UK Ltd. Royal Hospital Road, opp Christchurch street
- St Loo Avenue
- ubitricity Distributed Energy Systems UK Ltd. 113 Flood Street
- Embankment Gardens
- Chelsea Manor Street
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. Royal Hospital Road, opp Christchurch street · 45p per kWh · 5 kW · 110 yd
- Fastest nearby
- St Loo Avenue · 22 kW · 0.1 mi