Total Energies · EV charging site
Clancarty Street
99 Clancarty Street, Fulham, SW6 3AA
Clancarty Street is an EV charging site in Fulham, Greater London, run by Total Energies. Its 3 sockets reach up to 7 kW, with Type 2 at the top speed. 1,054 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Sainsburys Fulham Wharf (Smart Charge by Sainsbury's), 0.5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.059/minute; min £1.18; other tariffs available(from Open Charge Map, 10 Nov 2017)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Clancarty Street (Total Energies)?
The listed price is £0.059/minute; min £1.18; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at Clancarty Street (Total Energies)?
Up to 7 kW AC via Type 2, J-1772.
How many charging sockets does Clancarty Street (Total Energies) have?
3 charging sockets: 3 × 7 kW Type 2, 3 × 4 kW J-1772.
Who operates Clancarty Street?
Clancarty Street is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Clancarty Street (Total Energies)?
Sainsburys Fulham Wharf (Smart Charge by Sainsbury's) is 0.5 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Clancarty Street (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Clancarty Street (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Clancarty Street (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. 68 Clancarty Road, Opposite 68
- Clancarty Road
- ubitricity Distributed Energy Systems UK Ltd. 141 Studdridge Street, Outside 141
- ubitricity Distributed Energy Systems UK Ltd. 131 Studdridge Street, opp.
- ubitricity Distributed Energy Systems UK Ltd. 125 Studdridge Street, opp.
- Clancarty Road Site charge point re-position
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 68 Clancarty Road, Opposite 68 · 56p per kWh · 5 kW · 50 yd