Total Energies · EV charging site
Claremont Road
Claremont Road, Surbiton, KT6 4RF
Claremont Road is an EV charging site in Surbiton, Greater London, run by Total Energies. Its 2 sockets reach up to 4 kW, with Type 2 at the top speed, and charging is listed as free. 131 other charging sites are listed within a mile, and the nearest site with 50 kW or more is TFL Surbiton Fire Station (BP Pulse), 0.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- Free(from Open Charge Map, 4 Aug 2017)
- Getting there
- Free parking whilst charging.
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Claremont Road (Total Energies)?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at Claremont Road (Total Energies)?
Up to 4 kW AC via BS1363 3 Pin 13 Amp, Type 2.
How many charging sockets does Claremont Road (Total Energies) have?
2 charging sockets: 1 × 3 kW BS1363 3 Pin 13 Amp, 1 × 4 kW Type 2.
Who operates Claremont Road?
Claremont Road is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Claremont Road (Total Energies)?
TFL Surbiton Fire Station (BP Pulse) is 0.3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Claremont Road (Total Energies)?
A 10–80% charge takes about 13h 50m on the 4 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Claremont Road (Total Energies)?
A 10–80% charge takes about 9h 59m on the 4 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Claremont Road (Total Energies)?
A 10–80% charge takes about 12h 46m on the 4 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- North Road
- ubitricity Distributed Energy Systems UK Ltd. 37 North Road, Side Of and Rear Of No 37 St J
- Grove Road
- ubitricity Distributed Energy Systems UK Ltd. Road Grove, Outside Grove Pub
- St James Road
- ubitricity Distributed Energy Systems UK Ltd. 76 St James Road, Opposite No 76
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 37 North Road, Side Of and Rear Of No 37 St J · 56p per kWh · 5 kW · 0.1 mi
- Fastest nearby
- ubitricity Distributed Energy Systems UK Ltd. 37 North Road, Side Of and Rear Of No 37 St J · 5 kW · 0.1 mi