Total Energies · EV charging site
Clarendon Road
Opposite 104 Clarendon Road, Notting Hill, W11 2HR
Clarendon Road is an EV charging site in Notting Hill, Greater London, run by Total Energies. It has a single socket, with Type 2 at up to 22 kW. 826 other charging sites are listed within a mile, and the nearest site with 50 kW or more is London, UK - White City (Tesla), 0.6 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.073/minute; min £1.38; other tariffs available(from Open Charge Map, 30 May 2019)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Clarendon Road (Total Energies)?
The listed price is £0.073/minute; min £1.38; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at Clarendon Road (Total Energies)?
Up to 22 kW AC via J-1772, Type 2.
How many charging sockets does Clarendon Road (Total Energies) have?
1 charging socket: 1 × 4 kW J-1772, 1 × 7 kW Type 2, 1 × 22 kW Type 2.
Who operates Clarendon Road?
Clarendon Road is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Clarendon Road (Total Energies)?
London, UK - White City (Tesla) is 0.6 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Clarendon Road (Total Energies)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Clarendon Road (Total Energies)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Clarendon Road (Total Energies)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. 137 Blenheim Crescent, Opp.
- ubitricity Distributed Energy Systems UK Ltd. 122 Elgin Crescent
- ubitricity Distributed Energy Systems UK Ltd. 107 Elgin Crescent
- ubitricity Distributed Energy Systems UK Ltd. 77 Cornwall Crescent
- ubitricity Distributed Energy Systems UK Ltd. 2 Rosmead Road, opp.
- ubitricity Distributed Energy Systems UK Ltd. Walmer Road outside Flat 9-16, outside Flat 9
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 137 Blenheim Crescent, Opp. · 56p per kWh · 5 kW · 60 yd