Total Energies · EV charging site
Clifton Road
Clifton Road, New Malden, KT2 6PW
Clifton Road is an EV charging site in New Malden, Greater London (KT2 6PW), run by Total Energies. All 3 of its sockets are 7 kW Type 2. Amp Map lists 2 other charge points named Clifton Road in New Malden. 209 other charging sites are listed within a mile, and the nearest site with 50 kW or more is The Triangle (BP Pulse), 0.7 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Clifton Road (Total Energies)?
Up to 7 kW AC via Type 2.
How many charging sockets does Clifton Road (Total Energies) have?
3 charging sockets: 1 × 7 kW Type 2, 1 × 7 kW Type 2, 1 × 7 kW Type 2.
Who operates Clifton Road?
Clifton Road is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Clifton Road (Total Energies)?
The Triangle (BP Pulse) is 0.7 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Clifton Road (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Clifton Road (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Clifton Road (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. 268 Canbury Park Road, Outside 268
- Clifton Road
- ubitricity Distributed Energy Systems UK Ltd. 189 Canbury Park Road, Outside 189
- Cobham Road
- ubitricity Distributed Energy Systems UK Ltd. 175 Canbury Park Road, Outside 175
- ubitricity Distributed Energy Systems UK Ltd. 35 Clifton Road, Adjacent 35
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 268 Canbury Park Road, Outside 268 · 56p per kWh · 5 kW · 160 yd