# Comyn Road · Total Energies

Web page: https://ampmap.co.uk/charger/total-energies-comyn-road-uk

Comyn Road is an EV charging site in Latchmere, Greater London, run by Total Energies. Its 3 sockets reach up to 7 kW, with Type 2 at the top speed.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** 46 Comyn Road, SW11 1UG
- **Area:** Latchmere, Greater London, United Kingdom
- **Coordinates (latitude, longitude):** 51.46132, -0.17013

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 6 | Not listed |
| J-1772 | 4 kW | 9 | Not listed |

- **Price:** £0.059/minute; min £1.18; other tariffs available (from Open Charge Map)

## Site information

- **Operator:** Total Energies
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Comyn Road (Total Energies)?

The listed price is £0.059/minute; min £1.18; other tariffs available. Prices can change, so check the price at the charger before you start.

### How fast is charging at Comyn Road (Total Energies)?

Up to 7 kW AC via J-1772, Type 2.

### How many charging sockets does Comyn Road (Total Energies) have?

3 charging sockets: 3 × 4 kW J-1772, 3 × 7 kW Type 2, 3 × 4 kW J-1772, 3 × 7 kW Type 2, 3 × 4 kW J-1772.

### Who operates Comyn Road?

Comyn Road is on the Total Energies network.

### How long does a Tesla Model Y Long Range take to charge at Comyn Road (Total Energies)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Comyn Road (Total Energies)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Comyn Road (Total Energies)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Latchmere](https://ampmap.co.uk/chargers/united-kingdom/greater-london/latchmere)
- [Cheapest charging in Latchmere](https://ampmap.co.uk/chargers/united-kingdom/greater-london/latchmere/cheapest)
- [Total Energies chargers](https://ampmap.co.uk/networks/total-energies)

## Chargers near this site

- [ubitricity Distributed Energy Systems UK Ltd. opp 49 Comyn Road London](https://ampmap.co.uk/charger/ubitricity-opp-49-comyn-road-london-uk) - Ubitricity · Type 2 5 kW · opp 49 Comyn Road London · From 44p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. 28 Comyn Road London England SW11 1QD GB](https://ampmap.co.uk/charger/ubitricity-28-comyn-road-london-england-sw11-1qd-gb-uk) - Ubitricity · Type 2 5 kW · 28 Comyn Road London England SW11 1QD GB · From 44p/kWh
- [Severus Road · Total Energies](https://ampmap.co.uk/charger/total-energies-severus-road-uk) - Type 2 22 kW, Type 2 7 kW · 1 Severus Road
- [Bolingbroke Grove · Believ](https://ampmap.co.uk/charger/believ-bolingbroke-grove-uk) - Type 2 22 kW · Bolingbroke Grove
- [Limburg Road, A3 Battersea Rise · ESB Energy](https://ampmap.co.uk/charger/esb-energy-limburg-road-a3-battersea-rise-uk) - CHAdeMO 50 kW, Type 2 50 kW · Limburg Road, A3 Battersea Rise, Clapham
- [ubitricity Distributed Energy Systems UK Ltd. 52 Shelgate Road, Opp., Junc. Lindore Road](https://ampmap.co.uk/charger/ubitricity-52-shelgate-road-opp-junc-lindore-road-uk) - Ubitricity · Type 2 5 kW · 52 Shelgate Road, Opp., Junc. Lindore Road · From 45p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/total-energies-comyn-road-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 17 Oct 2019).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
