# Copse Hill (site 1) · Total Energies

Web page: https://ampmap.co.uk/charger/total-energies-copse-hill-site-1-uk

Copse Hill (site 1) is an EV charging site in New Malden, Greater London, run by Total Energies. Its 2 sockets reach up to 7 kW, with Type 2 at the top speed.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** 142 Copse Hill (site 1), SW20 0NP
- **Area:** New Malden, Greater London, United Kingdom
- **Coordinates (latitude, longitude):** 51.41678, -0.24483

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 4 | Not listed |
| J-1772 | 4 kW | 2 | Not listed |

- **Price:** £0.059/minute; min £1.18; other tariffs available (from Open Charge Map)

## Site information

- **Operator:** Total Energies
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Copse Hill (site 1) (Total Energies)?

The listed price is £0.059/minute; min £1.18; other tariffs available. Prices can change, so check the price at the charger before you start.

### How fast is charging at Copse Hill (site 1) (Total Energies)?

Up to 7 kW AC via Type 2, J-1772.

### How many charging sockets does Copse Hill (site 1) (Total Energies) have?

2 charging sockets: 2 × 7 kW Type 2, 2 × 4 kW J-1772, 2 × 7 kW Type 2.

### Who operates Copse Hill (site 1)?

Copse Hill (site 1) is on the Total Energies network.

### How long does a Tesla Model Y Long Range take to charge at Copse Hill (site 1) (Total Energies)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Copse Hill (site 1) (Total Energies)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Copse Hill (site 1) (Total Energies)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in New Malden](https://ampmap.co.uk/chargers/united-kingdom/greater-london/new-malden)
- [Cheapest charging in New Malden](https://ampmap.co.uk/chargers/united-kingdom/greater-london/new-malden/cheapest)
- [Total Energies chargers](https://ampmap.co.uk/networks/total-energies)

## Chargers near this site

- [MFG Robin Hood North · MFG EV Power](https://ampmap.co.uk/charger/mfg-ev-power-mfg-robin-hood-north-uk) - CCS 150 kW, CHAdeMO 50 kW · 325 Robin Hood Way
- [Outside 78 Melbury Gardens · Char.gy](https://ampmap.co.uk/charger/char-gy-outside-78-melbury-gardens-uk) - Type 2 4 kW · Outside 78 Melbury Gardens
- [Cottenham Park Road · SureCharge](https://ampmap.co.uk/charger/surecharge-cottenham-park-road-uk) - Type 2 5 kW · Cottenham Park Road
- [ubitricity Distributed Energy Systems UK Ltd. 119 Cottenham Park Road, Opp 119](https://ampmap.co.uk/charger/ubitricity-119-cottenham-park-road-opp-119-uk) - Ubitricity · Type 2 5 kW · 119 Cottenham Park Road, Opp 119 · From 45p/kWh
- [Currie Motors Kingston · Total Energies](https://ampmap.co.uk/charger/total-energies-currie-motors-kingston-uk) - Type 2 7 kW · Coombe Lane Fly-over
- [Oakwood Road · Char.gy](https://ampmap.co.uk/charger/char-gy-oakwood-road-uk) - Type 2 5 kW · Oakwood Road

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/total-energies-copse-hill-site-1-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 1 Apr 2019).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
