# Currie Motors Kingston · Total Energies

Web page: https://ampmap.co.uk/charger/total-energies-currie-motors-kingston-uk

Currie Motors Kingston is an EV charging site in New Malden, Greater London, run by Total Energies. Both of its sockets are 7 kW Type 2, and charging is listed as free.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Coombe Lane Fly-over, SW20 0AD
- **Area:** New Malden, Greater London, United Kingdom
- **Coordinates (latitude, longitude):** 51.41537, -0.25205
- **Getting there:** Charges may apply - refer to the owner of the parking bay for details.

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 2 | Not listed |

- **Price:** Free (from Open Charge Map)

## Site information

- **Operator:** Total Energies
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required
- **Notes:** Chargemaster post. Polar Network cards / App accepted as well as Source London.

## Common questions

### How much does it cost to charge at Currie Motors Kingston (Total Energies)?

The listed price is Free. Prices can change, so check the price at the charger before you start.

### How fast is charging at Currie Motors Kingston (Total Energies)?

Up to 7 kW AC via Type 2.

### How many charging sockets does Currie Motors Kingston (Total Energies) have?

2 charging sockets: 2 × 7 kW Type 2.

### Who operates Currie Motors Kingston?

Currie Motors Kingston is on the Total Energies network. For site issues, the operator lists 0845 850 0653.

### How long does a Tesla Model Y Long Range take to charge at Currie Motors Kingston (Total Energies)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Currie Motors Kingston (Total Energies)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Currie Motors Kingston (Total Energies)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in New Malden](https://ampmap.co.uk/chargers/united-kingdom/greater-london/new-malden)
- [Cheapest charging in New Malden](https://ampmap.co.uk/chargers/united-kingdom/greater-london/new-malden/cheapest)
- [Total Energies chargers](https://ampmap.co.uk/networks/total-energies)

## Chargers near this site

- [MFG Robin Hood North · MFG EV Power](https://ampmap.co.uk/charger/mfg-ev-power-mfg-robin-hood-north-uk) - CCS 150 kW, CHAdeMO 50 kW · 325 Robin Hood Way
- [Copse Hill (site 1) · Total Energies](https://ampmap.co.uk/charger/total-energies-copse-hill-site-1-uk) - Type 2 7 kW, J-1772 4 kW · 142 Copse Hill (site 1)
- [Huntley Way · SureCharge](https://ampmap.co.uk/charger/surecharge-huntley-way-uk) - Type 2 4 kW · Huntley Way
- [ubitricity Distributed Energy Systems UK Ltd. 7 Huntley Way, Outside 7](https://ampmap.co.uk/charger/ubitricity-7-huntley-way-outside-7-uk) - Ubitricity · Type 2 5 kW · 7 Huntley Way, Outside 7 · From 45p/kWh
- [Oakwood Road · Char.gy](https://ampmap.co.uk/charger/char-gy-oakwood-road-uk) - Type 2 5 kW · Oakwood Road
- [Outside 78 Melbury Gardens · Char.gy](https://ampmap.co.uk/charger/char-gy-outside-78-melbury-gardens-uk) - Type 2 4 kW · Outside 78 Melbury Gardens

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/total-energies-currie-motors-kingston-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 17 Nov 2016).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
