# Dagenham Road Car Park · Total Energies

Web page: https://ampmap.co.uk/charger/total-energies-dagenham-road-car-park-uk

Dagenham Road Car Park is an EV charging site in Romford, Greater London, run by Total Energies. Its 3 sockets reach up to 7 kW, with Type 2 at the top speed.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** 104a Dagenham Road Car Park, RM7 0TJ
- **Area:** Romford, Greater London, United Kingdom
- **Coordinates (latitude, longitude):** 51.56448, 0.17570

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 3 | Not listed |
| J-1772 | 4 kW | 3 | Not listed |

- **Price:** £0.059/minute; min £1.18; other tariffs available (from Open Charge Map)

## Site information

- **Operator:** Total Energies
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Dagenham Road Car Park (Total Energies)?

The listed price is £0.059/minute; min £1.18; other tariffs available. Prices can change, so check the price at the charger before you start.

### How fast is charging at Dagenham Road Car Park (Total Energies)?

Up to 7 kW AC via Type 2, J-1772.

### How many charging sockets does Dagenham Road Car Park (Total Energies) have?

3 charging sockets: 3 × 7 kW Type 2, 3 × 4 kW J-1772.

### Who operates Dagenham Road Car Park?

Dagenham Road Car Park is on the Total Energies network.

### How long does a Tesla Model Y Long Range take to charge at Dagenham Road Car Park (Total Energies)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Dagenham Road Car Park (Total Energies)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Dagenham Road Car Park (Total Energies)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Romford](https://ampmap.co.uk/chargers/united-kingdom/greater-london/romford)
- [Cheapest charging in Romford](https://ampmap.co.uk/chargers/united-kingdom/greater-london/romford/cheapest)
- [Total Energies chargers](https://ampmap.co.uk/networks/total-energies)

## Chargers near this site

- [MFG Coopers Arms · MFG EV Power](https://ampmap.co.uk/charger/mfg-ev-power-mfg-coopers-arms-uk) - CCS 150 kW, CHAdeMO 50 kW · Rush Green Road
- [Romford Waterloo Road 1 · ChargePoint](https://ampmap.co.uk/charger/chargepoint-romford-waterloo-road-1-uk) - Type 2 22 kW · Waterloo Road
- [Romford Waterloo Road 2 · ChargePoint](https://ampmap.co.uk/charger/chargepoint-romford-waterloo-road-2-uk) - Type 2 22 kW · Waterloo Road
- [Pod Point Tesco Extra - Romford](https://ampmap.co.uk/charger/pod-point-tesco-extra-romford-uk) - CCS / CHAdeMO 50 kW, Type 2 22 kW · 300 Hornchurch Road · From 44.4p/kWh
- [Pod Point Advance Motors](https://ampmap.co.uk/charger/pod-point-tony-levoi-vauxhall-romford-uk) - Type 2 7 kW · 144 London Road · From 88.8p/kWh
- [Romford Ambulance Station · Hubsta](https://ampmap.co.uk/charger/hubsta-romford-ambulance-station-uk) - Type 2 4 kW · Regarth Avenue

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/total-energies-dagenham-road-car-park-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 2 May 2018).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
