Total Energies · EV charging site
Danby Street
Danby Street, Peckham, SE15 4BW
Danby Street is an EV charging site in Peckham, Greater London, run by Total Energies. It has a single socket, with Type 2 at up to 7 kW. 643 other charging sites are listed within a mile, and the nearest site with 50 kW or more is MFG BP - Dulwich (GeniePoint), 0.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.059/minute; min £1.18; other tariffs available(from Open Charge Map, 27 Apr 2017)
- Phone (from Open Charge Map)
- 0845 850 0653
- Notes
- IER model charge point
- Getting there
- Charges may apply - refer to the owner of the parking bay for details. Hours accessible: 24 Hrs
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Danby Street (Total Energies)?
The listed price is £0.059/minute; min £1.18; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at Danby Street (Total Energies)?
Up to 7 kW AC via Type 2, J-1772.
How many charging sockets does Danby Street (Total Energies) have?
1 charging socket: 1 × 7 kW Type 2, 1 × 4 kW J-1772.
Who operates Danby Street?
Danby Street is on the Total Energies network. For site issues, the operator lists 0845 850 0653.
Where is the nearest charger with 50 kW or more to Danby Street (Total Energies)?
MFG BP - Dulwich (GeniePoint) is 0.4 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Danby Street (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Danby Street (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Danby Street (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.