Total Energies · EV charging site
Deans Gardens Cpark
Deans Gardens Cpark 5 Seaford RD, West Ealing, W13 9HP
Deans Gardens Cpark is an EV charging site in West Ealing, Greater London, run by Total Energies. Its 2 sockets reach up to 22 kW, with Type 2 at the top speed. 75 other charging sites are listed within a mile, and the nearest site with 50 kW or more is MFG Studley Grange (MFG EV Power), 0.6 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.059/minute; min £1.18; other tariffs available(from Open Charge Map, 13 Jun 2019)
- Getting there
- In pay and display car park
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Deans Gardens Cpark (Total Energies)?
The listed price is £0.059/minute; min £1.18; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at Deans Gardens Cpark (Total Energies)?
Up to 22 kW AC via J-1772, Type 2.
How many charging sockets does Deans Gardens Cpark (Total Energies) have?
2 charging sockets: 2 × 4 kW J-1772, 2 × 7 kW Type 2, 2 × 4 kW J-1772, 1 × 22 kW Type 2.
Who operates Deans Gardens Cpark?
Deans Gardens Cpark is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Deans Gardens Cpark (Total Energies)?
MFG Studley Grange (MFG EV Power) is 0.6 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Deans Gardens Cpark (Total Energies)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Deans Gardens Cpark (Total Energies)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Deans Gardens Cpark (Total Energies)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.