# Deans Gardens Cpark · Total Energies

Web page: https://ampmap.co.uk/charger/total-energies-deans-gardens-cpark-uk

Deans Gardens Cpark is an EV charging site in West Ealing, Greater London, run by Total Energies. Its 2 sockets reach up to 22 kW, with Type 2 at the top speed.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Deans Gardens Cpark 5 Seaford RD, W13 9HP
- **Area:** West Ealing, Greater London, United Kingdom
- **Coordinates (latitude, longitude):** 51.50995, -0.32201
- **Getting there:** In pay and display car park

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 22 kW | 1 | Not listed |
| Type 2 | 7 kW | 2 | Not listed |
| J-1772 | 4 kW | 4 | Not listed |

- **Price:** £0.059/minute; min £1.18; other tariffs available (from Open Charge Map)

## Site information

- **Operator:** Total Energies
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Deans Gardens Cpark (Total Energies)?

The listed price is £0.059/minute; min £1.18; other tariffs available. Prices can change, so check the price at the charger before you start.

### How fast is charging at Deans Gardens Cpark (Total Energies)?

Up to 22 kW AC via J-1772, Type 2.

### How many charging sockets does Deans Gardens Cpark (Total Energies) have?

2 charging sockets: 2 × 4 kW J-1772, 2 × 7 kW Type 2, 2 × 4 kW J-1772, 1 × 22 kW Type 2.

### Who operates Deans Gardens Cpark?

Deans Gardens Cpark is on the Total Energies network.

### How long does a Tesla Model Y Long Range take to charge at Deans Gardens Cpark (Total Energies)?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Deans Gardens Cpark (Total Energies)?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Deans Gardens Cpark (Total Energies)?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in West Ealing](https://ampmap.co.uk/chargers/united-kingdom/greater-london/west-ealing)
- [Cheapest charging in West Ealing](https://ampmap.co.uk/chargers/united-kingdom/greater-london/west-ealing/cheapest)
- [Total Energies chargers](https://ampmap.co.uk/networks/total-energies)

## Chargers near this site

- [Seaford Road · Total Energies](https://ampmap.co.uk/charger/total-energies-seaford-road-uk) - Type 2 7 kW · Seaford Road
- [Sherwood Close · Believ](https://ampmap.co.uk/charger/believ-sherwood-close-uk) - Type 2 22 kW · Sherwood Close
- [Mornington Road · Total Energies](https://ampmap.co.uk/charger/total-energies-mornington-road-uk) - Type 2 7 kW · Mornington Road
- [West Ealing Library, Ealing · Charge Your Car](https://ampmap.co.uk/charger/charge-your-car-west-ealing-library-ealing-uk) - Type 2 7 kW · Melbourne Avneue
- [Brisbane Road · Total Energies](https://ampmap.co.uk/charger/total-energies-brisbane-road-uk) - Type 2 7 kW · Brisbane Road
- [Hastings Road · Total Energies](https://ampmap.co.uk/charger/total-energies-hastings-road-uk) - Type 2 7 kW, J-1772 4 kW · 40 Hastings Road

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/total-energies-deans-gardens-cpark-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 13 Jun 2019).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
