# East Finchley High Road · Total Energies

Web page: https://ampmap.co.uk/charger/total-energies-east-finchley-high-road-uk

East Finchley High Road is an EV charging site in Muswell Hill, Greater London, run by Total Energies. Its 2 sockets reach up to 7 kW, with Type 2 at the top speed.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** 120 High Road, N2 9ED
- **Area:** Muswell Hill, Greater London, United Kingdom
- **Coordinates (latitude, longitude):** 51.59039, -0.16420

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 2 | Not listed |
| J-1772 | 4 kW | 2 | Not listed |

- **Price:** £0.059/minute; min £1.18; other tariffs available. Parking fees may apply (from Open Charge Map)

## Site information

- **Operator:** Total Energies
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at East Finchley High Road (Total Energies)?

The listed price is £0.059/minute; min £1.18; other tariffs available. Parking fees may apply. Prices can change, so check the price at the charger before you start.

### How fast is charging at East Finchley High Road (Total Energies)?

Up to 7 kW AC via J-1772, Type 2.

### How many charging sockets does East Finchley High Road (Total Energies) have?

2 charging sockets: 2 × 4 kW J-1772, 2 × 7 kW Type 2.

### Who operates East Finchley High Road?

East Finchley High Road is on the Total Energies network.

### How long does a Tesla Model Y Long Range take to charge at East Finchley High Road (Total Energies)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at East Finchley High Road (Total Energies)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at East Finchley High Road (Total Energies)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Muswell Hill](https://ampmap.co.uk/chargers/united-kingdom/greater-london/muswell-hill)
- [Total Energies chargers](https://ampmap.co.uk/networks/total-energies)

## Chargers near this site

- [hub\_l003901\_cs\_01 · Trojan Energy](https://ampmap.co.uk/charger/trojan-energy-hub-l003901-cs-01-uk) - Type 2 22 kW · Leicester Road
- [hub\_l003301\_cs\_01 · Trojan Energy](https://ampmap.co.uk/charger/trojan-energy-hub-l003301-cs-01-uk) - Type 2 22 kW · Bedford Road
- [hub\_l003801\_cs\_15 · Trojan Energy](https://ampmap.co.uk/charger/trojan-energy-hub-l003801-cs-15-uk) - Type 2 22 kW · Leicester Road
- [East Finchley · Fastned](https://ampmap.co.uk/charger/esb-energy-east-finchley-underground-station-taxi-charger-ea-uk) - CCS 400 kW, CCS / CHAdeMO 400 kW · 1 High Rd · From 79p/kWh
- [hub\_l003101\_cs\_05 · Trojan Energy](https://ampmap.co.uk/charger/trojan-energy-hub-l003101-cs-05-uk) - Type 2 22 kW · Baronsmere Road
- [East Finchley LU Station Car Park · ESB Energy](https://ampmap.co.uk/charger/esb-energy-east-finchley-lu-station-car-park-uk) - CHAdeMO 50 kW, Type 2 50 kW · East Finchley LU Station Car Park, High Road

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/total-energies-east-finchley-high-road-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 27 Apr 2017).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
